Integrating the multi-objective particle swarm optimization-based time–cost trade-off model with earned value management

被引:0
|
作者
Chauhan M. [1 ]
Kumar R. [1 ]
机构
[1] Department of Civil Engineering, Dr. K.N Modi University, Rajasthan, Newai
关键词
EVM theory; MOPSO; Rescheduling; TCT problems;
D O I
10.1007/s42107-023-00710-5
中图分类号
学科分类号
摘要
Many interrelated activities exist in real construction projects, and each activity can be carried out in a variety of ways with varying resource requirements, times to completion, and costs. A significant amount of focus has been placed on construction project scheduling while resolving time–cost trade-off problems (TCTPs) prior to carrying out the actual construction. However, according to the earned value management (EVM) principle, if a project deviates from the real time and cost budgeted, it should be rescheduled throughout the execution phase. The article first identifies the optimal combination of activities based on multi-objective particle swarm optimization (MOPSO) for this purpose, and then uses the EVM theory to predict the project's overall performance at a specific point in execution. If anticipated project performance points to rescheduling, the revised alternatives must be allocated to project activities. Construction managers may more easily arrange, manage, and reschedule actual construction projects with the use of the created TCT-EVM model before and during the execution phase. To show how useful and effective the established model is, it is also used in a case study project. Moreover, after contrasting the outcomes with those attained using pre-existing TCT models, the superiority of the created model is shown. © 2023, The Author(s), under exclusive licence to Springer Nature Switzerland AG.
引用
下载
收藏
页码:3293 / 3303
页数:10
相关论文
共 50 条
  • [21] A Multi-Objective Trade-Off Model in Sustainable Construction Projects
    Wu, Guangdong
    SUSTAINABILITY, 2017, 9 (11)
  • [22] Multi-Objective Particle Swarm Optimization based on particle density
    Hasegawa T.
    Ishigame A.
    Yasuda K.
    IEEJ Transactions on Electronics, Information and Systems, 2010, 130 (07) : 1207 - 1212+16
  • [23] Multi-objective optimization for safety and reliability trade-off: Optimization and results processing
    Johansson, Cristina
    Olvander, Johan
    Derelov, Micael
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2018, 232 (06) : 661 - 676
  • [24] Multi-objective particle swarm optimization for construction time-cost tradeoff problems
    Zhang, Hong
    Li, Heng
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (01) : 75 - 88
  • [25] SIMULATION BASED MULTI-OBJECTIVE COST-TIME TRADE-OFF FOR MULTI-FAMILY RESIDENTIAL OFF-SITE CONSTRUCTION
    Hamdan, Samer Bu
    Alwisy, Aladdin
    Al-Hussein, Mohamed
    AbouRizk, Simaan
    Ajweh, Ziad
    2015 WINTER SIMULATION CONFERENCE (WSC), 2015, : 3391 - 3401
  • [26] Compromise point incorporating trade-off ratio in multi-objective optimization
    Kitayama, Satoshi
    Yamazaki, Koetsu
    APPLIED SOFT COMPUTING, 2012, 12 (08) : 1959 - 1964
  • [27] Multi-Objective Optimization of Construction Project Time-Cost-Quality Trade-off Using Differential Evolution Algorithm
    Narayanan, A. Sathya
    Suribabu, C. R.
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2014, 8 (04) : 375 - 392
  • [28] Robust control design for ipmc based on a multi-objective particle swarm optimization-based operator approach
    Wang, Aihui
    Chang, Yiping
    Zhao, Chunli
    Wang, Yan
    ICIC Express Letters, 2016, 10 (05): : 1061 - 1069
  • [30] An Accident Severity Classification Model Based on Multi-Objective Particle Swarm Optimization
    Wang, Chunlu
    Qiu, Chenye
    Zuo, Xingquan
    Liu, Chuanyi
    IEICE TRANSACTIONS ON INFORMATION AND SYSTEMS, 2014, E97D (11): : 2863 - 2871