Dam breach analysis: a case of Gidabo dam, Southern Ethiopia

被引:0
|
作者
H. B. Desta
M. Z. Belayneh
机构
[1] Dilla University,Department of Hydraulic and Water Resources Engineering
[2] Hawassa University,Department of Hydraulic and Water Resources Engineering
关键词
Gidabo; Breach; Overtopping; Probable maximum flood;
D O I
暂无
中图分类号
学科分类号
摘要
Gidabo dam provides flood control and irrigation water supply for sugarcane and rice cultivation. The dam has 25.8 m height and 335 m crest length with side ogee spillway to pass 10,000 years’ flood. There were different economic developments downstream of the dam including irrigation command area and irrigation structures. Since Nature is full of uncertainties, it is likely that Gidabo dam can be subjected to sudden breaches due to the probable maximum flood. Therefore, dam breach analysis and flood inundation map preparation should be conducted. The Hydrologic Engineering Center’s River Analysis System new version was used to analyze the dam breach for overtopping failure. River analysis system Mapper which is Geographic information system tool of Hydrologic Engineering Center’s River Analysis and Geographic information system were used to develop flood inundation map. Dam breach parameters were calculated within the Geographic information system model by using beach parameter calculator tab. A two-dimensional unsteady flow simulation of the dam breach was performed by using the inflow hydrograph as upstream boundary condition. From the rainfall data analysis, the probable maximum precipitation resulting probable maximum flood was found 277 mm results a peak inflow of 6387 m3/s. It was found that the breach bottom width was 143 m while the breach side slope (horizontal: vertical) was 1.4:1 and 2.7 h breach formation time. The peak breach outflow was found to be 15,848.85 m3/s which covers 2050 hectares with maximum depth of 12.14 m.
引用
收藏
页码:107 / 122
页数:15
相关论文
共 50 条
  • [31] Dam Breach Simulation with the Material Point Method
    Cao, Chendi
    Neilsen, Mitchell
    COMPUTATION, 2021, 9 (02) : 1 - 14
  • [32] Uncertainty of predictions of embankment dam breach parameters
    Wahl, TL
    JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 2004, 130 (05): : 389 - 397
  • [33] Embankment dam breach and its outflow characteristics
    Chinnarasri, C
    Jirakitlerd, S
    Wongwises, S
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2004, 21 (04) : 247 - 264
  • [34] Breach of a tailings dam in the 2011 earthquake in Japan
    Ishihara, Kenji
    Ueno, Kennosuke
    Yamada, Seishi
    Yasuda, Susumu
    Yoneoka, Takeshi
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2015, 68 : 3 - 22
  • [35] Tailings Dam Breach Outflow Modelling: A Review
    Sreekumar, Uthra
    Gildeh, Hossein Kheirkhah
    Mohammadian, Abdolmajid
    Rennie, Colin
    Nistor, Ioan
    MINE WATER AND THE ENVIRONMENT, 2024, 43 (04) : 563 - 587
  • [36] BREACH OF A NATURALLY EMBANKED DAM ON YALONG RIVER
    CHEN, YJ
    ZHOU, F
    FENG, Y
    XIA, YC
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1992, 19 (05) : 811 - 818
  • [37] What has happened there? - The dam breach in Libya
    Aufleger, Markus
    WASSERWIRTSCHAFT, 2024, 114 (04) : 3 - 3
  • [38] Judgement and analysis of dam-break possibility and final breach shape
    Tan G.
    Wang J.
    Zhang C.
    Wang R.
    Shu C.
    Ma Z.
    Zhang G.
    Han S.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2024, 43 : 3413 - 3427
  • [39] Sensitivity Analysis of Dam Breach Parameters for Variation Capacity Earthen Dams
    Chau Kim Tran
    ASIAN JOURNAL OF WATER ENVIRONMENT AND POLLUTION, 2021, 18 (03) : 1 - 9
  • [40] Case study of the Big Bay Dam failure: Accuracy and comparison of breach predictions
    Yochum, Steven E.
    Goertz, Larry A.
    Jones, Phillip H.
    JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 2008, 134 (09): : 1285 - 1293