共 50 条
- [31] A Multi-objective Memetic Algorithm for the Job-Shop Scheduling Problem Operational Research, 2013, 13 : 233 - 250
- [34] An improved particle swarm optimization for multi-objective flexible job-shop scheduling problem PROCEEDINGS OF 2007 IEEE INTERNATIONAL CONFERENCE ON GREY SYSTEMS AND INTELLIGENT SERVICES, VOLS 1 AND 2, 2007, : 1584 - 1589
- [35] Study on Multi-objective Flexible Job-shop Scheduling Problem considering Energy Consumption JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2014, 7 (03): : 589 - 604
- [38] Heuristic optimization for dual-resource constrained job shop scheduling 2009 INTERNATIONAL ASIA CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION, AND ROBOTICS, PROCEEDINGS, 2009, : 485 - 488
- [39] Improved NSGA-II for the multi-objective flexible job-shop scheduling problem Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2010, 46 (11): : 156 - 164