Evolutionary algorithms for multi-objective dual-resource constrained flexible job-shop scheduling problem

被引:1
|
作者
M. Yazdani
M. Zandieh
R. Tavakkoli-Moghaddam
机构
[1] Islamic Azad University,Department of Industrial Engineering, Faculty of Industrial and Mechanical Engineering, Qazvin Branch
[2] Shahid Beheshti University,Department of Industrial Management, Management and Accounting Faculty
[3] G.C.,School of Industrial Engineering, College of Engineering
[4] University of Tehran,undefined
来源
OPSEARCH | 2019年 / 56卷
关键词
Scheduling; Flexible job-shop; Dual-resource constrained; Multi-objective optimization; Multi-objective evolutionary algorithm; Controlled elitism procedure;
D O I
暂无
中图分类号
学科分类号
摘要
This paper presents a multi-objective dual-resource constrained flexible job-shop scheduling problem (MODRCFJSP) with the objectives of minimizing the makespan, critical machine workload and total workload of machines simultaneously. Two types of multi-objective evolutionary algorithms including fast elitist non-dominated sorting genetic algorithm (NSGA-II) and non-dominated ranking genetic algorithm (NRGA) are proposed for solving MODRCFJSP. Some efficient mutation and crossover operators are adapted to the special chromosome structure of the problem for producing new solutions in the algorithm’s generations. Besides, we provide controlled elitism based version of NSGA-II and NRGA, namely controlled elitist NSGA-II (CENSGA-II) and controlled elitist NRGA (CENRGA), to optimize MODRCFJSP. To show the performance of the four proposed algorithms, numerical experiments with randomly generated test problems are used. Moreover, different convergence and diversity performance metrics are employed to illustrate the relative performance of the presented algorithms.
引用
收藏
页码:983 / 1006
页数:23
相关论文
共 50 条
  • [31] A Multi-objective Memetic Algorithm for the Job-Shop Scheduling Problem
    Mariano Frutos
    Fernando Tohmé
    Operational Research, 2013, 13 : 233 - 250
  • [32] An improved multi-objective genetic algorithm for fuzzy flexible job-shop scheduling problem
    Wang, Xiaojuan
    Li, Wenfeng
    Zhang, Ying
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2013, 47 (2-3) : 280 - 288
  • [33] A cloud based improved method for multi-objective flexible job-shop scheduling problem
    Ning, Tao
    Jin, Hua
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 35 (01) : 823 - 829
  • [34] An improved particle swarm optimization for multi-objective flexible job-shop scheduling problem
    Jia, Zhaohong
    Chen, Huaping
    Tang, Jun
    PROCEEDINGS OF 2007 IEEE INTERNATIONAL CONFERENCE ON GREY SYSTEMS AND INTELLIGENT SERVICES, VOLS 1 AND 2, 2007, : 1584 - 1589
  • [35] Study on Multi-objective Flexible Job-shop Scheduling Problem considering Energy Consumption
    Jiang, Zengqiang
    Zuo, Le
    Mingcheng E
    JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2014, 7 (03): : 589 - 604
  • [36] A PARTICLE SWARM OPTIMIZATION ALGORITHM FOR THE MULTI-OBJECTIVE FLEXIBLE JOB-SHOP SCHEDULING PROBLEM
    Sun, Ying
    He, Jingbo
    JOURNAL OF NONLINEAR AND CONVEX ANALYSIS, 2024, 25 (03) : 579 - 590
  • [37] An object-oriented approach for multi-objective flexible job-shop scheduling problem
    Kaplanoglu, Vahit
    EXPERT SYSTEMS WITH APPLICATIONS, 2016, 45 : 71 - 84
  • [38] Heuristic optimization for dual-resource constrained job shop scheduling
    Ren Huiyuan
    Jiang Lili
    Xi Xiaoying
    Li Muzhi
    2009 INTERNATIONAL ASIA CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION, AND ROBOTICS, PROCEEDINGS, 2009, : 485 - 488
  • [39] Improved NSGA-II for the multi-objective flexible job-shop scheduling problem
    Zhang C.
    Dong X.
    Wang X.
    Li X.
    Liu Q.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2010, 46 (11): : 156 - 164
  • [40] An energy-efficient multi-objective optimization for flexible job-shop scheduling problem
    Mokhtari, Hadi
    Hasani, Aliakbar
    COMPUTERS & CHEMICAL ENGINEERING, 2017, 104 : 339 - 352