Parallel batch scheduling of equal-length jobs with release and due dates

被引:0
|
作者
Alessandro Condotta
Sigrid Knust
Natalia V. Shakhlevich
机构
[1] University of Leeds,School of Computing
[2] Technical University of Clausthal,Institute of Mathematics
来源
Journal of Scheduling | 2010年 / 13卷
关键词
Single machine scheduling; Parallel machine scheduling; Parallel batching; Complexity;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper we study parallel batch scheduling problems with bounded batch capacity and equal-length jobs in a single and parallel machine environment. It is shown that the feasibility problem 1|p-batch,b<n,rj,pj=p,Cj≤dj|− can be solved in O(n2) time and that the problem of minimizing the maximum lateness can be solved in O(n2log n) time. For the parallel machine problem P|p-batch,b<n,rj,pj=p,Cj≤dj|− an O(n3log n)-time algorithm is provided, which can also be used to solve the problem of minimizing the maximum lateness in O(n3log 2n) time.
引用
收藏
页码:463 / 477
页数:14
相关论文
共 50 条