共 50 条
- [41] RISK EVALUATION OF TUNNELLING PROJECTS BY FUZZY TOPSIS INTERNATIONAL CONFERENCE ON MANAGEMENT (ICM 2011), 2011, : 1219 - 1232
- [43] A Hybrid Fuzzy DEA/AHP Methodology for Ranking Units in a Fuzzy Environment SYMMETRY-BASEL, 2017, 9 (11):
- [44] A NOVEL METHODOLOGY FOR TIME PLANNING OF RESOURCE-CONSTRAINED SOFTWARE PROJECTS WITH HESITANT FUZZY DURATIONS: A CASE STUDY INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2019, 26 (04): : 471 - 485
- [46] A Fuzzy Logic Based Risk Assessment Approach for Evaluating and Prioritizing Risks in Cloud Computing Environment RECENT TRENDS IN INFORMATION AND COMMUNICATION TECHNOLOGY, 2018, 5 : 650 - 659
- [47] Evaluating e-commerce projects using an information fusion methodology ENHANCING THE POWER OF THE INTERNET, 2004, 139 : 245 - 258
- [50] Impact of Development Methodology on Cost & Risk for Development Projects 2017 6TH INTERNATIONAL CONFERENCE ON RELIABILITY, INFOCOM TECHNOLOGIES AND OPTIMIZATION (TRENDS AND FUTURE DIRECTIONS) (ICRITO), 2017, : 267 - 272