On the complexity of proportionate open shop and job shop problems

被引:0
|
作者
Abdennour Azerine
Mourad Boudhar
Djamal Rebaine
机构
[1] Université des Sciences et de la Technologie Houari Boumedienne,Laboratoire RECITS, Faculté de Mathématiques
[2] CERIST,Research Center on Scientific and Technical Information
[3] Université du Québec à Chicoutimi,Département d’Informatique et de Mathématique
来源
Optimization Letters | 2024年 / 18卷
关键词
Proportionate shop; Complexity; Scheduling; Makespan; Maximum lateness; Mean finish time; Just-in-time;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we present NP\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\mathcal{N}\mathcal{P}$$\end{document}-hardness proofs and exhibit linear-time algorithms for proportionate two-machine open shop and job shop problems with respect to the maximum lateness, the makespan with release dates, the total weighted completion times and the number of just-in-time jobs.
引用
下载
收藏
页码:365 / 375
页数:10
相关论文
共 50 条
  • [41] A rollout metaheuristic for job shop scheduling problems
    Meloni, C
    Pacciarelli, D
    Pranzo, M
    ANNALS OF OPERATIONS RESEARCH, 2004, 131 (1-4) : 215 - 235
  • [42] Hybrid Metaheuristics for Job Shop Scheduling Problems
    Nugraheni, Cecilia E.
    Swastiani, D.
    Abednego, L.
    ENGINEERING LETTERS, 2022, 30 (04) : 1444 - 1451
  • [43] Greedy heuristics for distributed job shop problems
    Azab, Ahmed
    Naderi, B.
    2ND ICRM 2014 INTERNATIONAL CONFERENCE ON RAMP-UP MANAGEMENT, 2014, 20 : 7 - 12
  • [44] PLATERS FORUM CONSIDERS JOB SHOP PROBLEMS
    不详
    INDUSTRIAL FINISHING, 1972, 48 (09): : 48 - &
  • [45] Combining Neighbourhoods in Fuzzy Job Shop Problems
    Puente, Jorge
    Vela, Camino R.
    Gonzalez-Rodriguez, Ines
    ADVANCES IN ARTIFICIAL INTELLIGENCE, 2011, 7023 : 343 - +
  • [46] Job shop scheduling problems with genetic algorithms
    Ferrolho, Antonio
    Crisostomo, Manuel
    Wojcik, Robert
    2007 INTERNATIONAL CONFERENCE ON COMPUTER ENGINEERING & SYSTEMS: ICCES '07, 2007, : 76 - +
  • [47] Acquisition of scheduling rules for job shop problems
    Suwa, H
    Fujii, S
    Morita, H
    MANAGEMENT AND CONTROL OF PRODUCTION AND LOGISTICS, VOL 1 AND 2, 1998, : 301 - 306
  • [48] Cyclic job shop scheduling problems with blocking
    Peter Brucker
    Thomas Kampmeyer
    Annals of Operations Research, 2008, 159 : 161 - 181
  • [49] Approximation algorithms for flexible job shop problems
    Jansen, K
    Mastrolilli, M
    Solis-Oba, R
    INTERNATIONAL JOURNAL OF FOUNDATIONS OF COMPUTER SCIENCE, 2005, 16 (02) : 361 - 379
  • [50] A New Concept in Advice Complexity of Job Shop Scheduling
    Wehner, David
    MATHEMATICAL AND ENGINEERING METHODS IN COMPUTER SCIENCE, MEMICS 2014, 2014, 8934 : 147 - 158