共 50 条
- [41] Hybrid Re-Scheduling Mechanisms for Workflow Applications on Multi-cluster Grid [J]. CCGRID: 2009 9TH IEEE INTERNATIONAL SYMPOSIUM ON CLUSTER COMPUTING AND THE GRID, 2009, : 116 - 123
- [42] A method of flow-shop re-scheduling dealing with variation of productive capacity [J]. 8TH WORLD MULTI-CONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL IV, PROCEEDINGS: INFORMATION SYSTEMS, TECHNOLOGIES AND APPLICATIONS: I, 2004, : 348 - 353
- [45] Investigating the robustness of re-scheduling policies with multi-agent system simulation [J]. The International Journal of Advanced Manufacturing Technology, 2011, 55 : 355 - 367
- [48] Re-Scheduling of Unit Commitment Based on Customers' Fuzzy Requirements for Power Reliability [J]. IEICE TRANSACTIONS ON INFORMATION AND SYSTEMS, 2011, E94D (07): : 1378 - 1385
- [49] Applying the concurrence concept for solving re-scheduling problems in software project development [J]. CHALLENGES OF INFORMATION TECHNOLOGY MANAGEMENT IN THE 21ST CENTURY, 2000, : 482 - 486