Safety Assessment of Dam Failure of Tailings Pond Based on Variable Weight Method: A Case Study in China

被引:0
|
作者
Congcong Chen
Bo Ma
机构
[1] University of Science and Technology Beijing,School of Civil and Resource Engineering
来源
关键词
Tailings pond; Tailings dam failure; Safety assessment; Variable weight method;
D O I
暂无
中图分类号
学科分类号
摘要
When assessing the safety of a tailings dam, the constant weight method (CWM) is one of the most commonly used methods. However, when the evaluation indicator value suggests serious defects, the evaluation value is often inconsistent with the actual situation. To address this issue, the variable weight method (VWM) is introduced to assess the safety of the tailings dam. Initially, a three-layer indicator system for dam failure safety assessment is built, and individual indicator values are divided into four grades. Then, an appropriate state variable weight function is constructed and relevant parameters are determined. Finally, a case study is illustrated to verify the effectiveness of the model. The assessment results of the VWM more closely represent the actual situation than that of the CWM, which is more helpful for decision makers and technicians to take scientific and reasonable precautionary measures, thereby improving the safety management of the tailings pond.
引用
收藏
页码:2401 / 2413
页数:12
相关论文
共 50 条
  • [41] Safety Assessment of Bridges Based on Variable Weight and D-S Evidence Theory
    Liang L.
    Sun S.
    Li M.
    Li X.
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2019, 40 (01): : 99 - 103
  • [42] Navigation risk assessment method based on flow conditions: A case study of the river reach between the Three Gorges Dam and the Gezhouba Dam
    Zhang, Shanghong
    Jing, Zhu
    Li, Wenda
    Wang, Long
    Liu, Dawei
    Wang, Taiwei
    OCEAN ENGINEERING, 2019, 175 : 71 - 79
  • [43] Assessment of Coal Mine Safety Based on Bayesian Method with Entropy Weight
    Mao Lizhen
    Feng Daguang
    PROCEEDINGS OF THE 30TH CHINESE CONTROL AND DECISION CONFERENCE (2018 CCDC), 2018, : 2924 - 2928
  • [44] Simulation of dam-break flood and risk assessment: a case study of Chengbi River Dam in Baise, China
    Mo, Chongxun
    Cen, Weiyan
    Lei, Xingbi
    Ban, Huazhen
    Ruan, Yuli
    Lai, Shufeng
    Shen, Yue
    Xing, Zhenxiang
    JOURNAL OF HYDROINFORMATICS, 2023, 25 (04) : 1276 - 1294
  • [45] Environmental risk assessment method for dense tailings ponds areas - a case study of the Yellow River Basin of Henan Province, China
    Wang, Han
    Liu, Mengshuo
    Jiang, Huiyuan
    Radu, Tanja
    Peng, Zhaoxu
    Wang, Li
    HUMAN AND ECOLOGICAL RISK ASSESSMENT, 2025, 31 (1-2): : 89 - 110
  • [46] Long-term influence of tailings wastewater on mechanical performance and microstructure of dam concrete: A case study in southeastern China
    Meng, Tao
    Lian, Songsong
    Yu, Hongming
    Yang, Chaojun
    Wang, Menghua
    CASE STUDIES IN CONSTRUCTION MATERIALS, 2021, 15
  • [47] Application of Set Pair Analysis Method Based on Entropy Weight in Groundwater Quality Assessment - A Case Study in Dongsheng City, Northwest China
    Li Pei-Yue
    Qian Hui
    Wu Jian-Hua
    E-JOURNAL OF CHEMISTRY, 2011, 8 (02) : 851 - 858
  • [48] HAZARD ASSESSMENT OF DEBRIS FLOWS BASED ON THE CATASTROPHE PROGRESSION METHOD: A CASE STUDY FROM THE WUDONGDE DAM SITE
    Shi, Mingyuan
    Chen, Jianping
    Sun, Dongyan
    Cao, Chen
    INTERNATIONAL JOURNAL OF HEAT AND TECHNOLOGY, 2015, 33 (04) : 217 - 220
  • [49] A fuzzy FMEA assessment of hydroelectric earth dam failure modes: A case study in Central Brazil
    Ribas, Jose Roberto
    Ribas Severo, Juliana Crenitte
    Guimaraes, Luciana Fernandes
    Currlin Perpetuo, Kim Parente
    ENERGY REPORTS, 2021, 7 : 4412 - 4424
  • [50] Assessment of technology adoption in construction safety management: Case study in China
    Xu, Jinjing
    Li, Jintao
    Chen, Xiaohong
    SCIENCE PROGRESS, 2024, 107 (04)