Coal-fired power plants face delay in United States

被引:0
|
作者
机构
关键词
D O I
10.1038/456293a
中图分类号
学科分类号
摘要
引用
收藏
页码:293 / 293
相关论文
共 50 条
  • [41] Alberta mercury regulation for coal-fired power plants
    Valupadas, Prasad
    [J]. FUEL PROCESSING TECHNOLOGY, 2009, 90 (11) : 1339 - 1342
  • [42] Shale Gas and the Replacement of Coal-Fired Power Plants
    Santos, V. E. S.
    Rego, E. E.
    Santos, E. M.
    Ribeiro, C. O.
    [J]. IEEE LATIN AMERICA TRANSACTIONS, 2016, 14 (08) : 3721 - 3730
  • [43] Mercury Partitioning in Coal-fired Power Plants in Japan
    Noda, Naoki
    Ito, Shigeo
    [J]. JOURNAL OF THE JAPAN INSTITUTE OF ENERGY, 2018, 97 (11) : 342 - 347
  • [44] Nonlinear control of coal-fired steam power plants
    Alamoodi, Nahla
    Daoutidis, Prodromos
    [J]. CONTROL ENGINEERING PRACTICE, 2017, 60 : 63 - 75
  • [45] Increasing the operating efficiency of coal-fired power plants
    Martin, H.
    [J]. VGB-Kraftwerkstechnik, 1988, 68 (03): : 219 - 225
  • [46] The impact of coal-fired power plants on respiratory sypmtoms
    Aker, A
    Melda, K
    Dilsad, C
    Nadi, B
    [J]. EPIDEMIOLOGY, 2000, 11 (04) : S138 - S138
  • [47] Assessing the cost of new coal-fired power plants
    Booras, G
    Hoskins, B
    [J]. POWER, 2005, 149 (08) : 24 - 28
  • [48] Mercury policy and regulations for coal-fired power plants
    Rallo, Manuela
    Lopez-Anton, M. Antonia
    Contreras, M. Luisa
    Maroto-Valer, M. Mercedes
    [J]. ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2012, 19 (04) : 1084 - 1096
  • [49] Architecture and design of smart coal-fired power plants
    Bao, Xiding
    Mao, Xiangyun
    Liu, Xinfcng
    Chcn, Hao
    Wang, Zhcnkc
    Zheng, Xiaoyong
    [J]. 2022 IEEE INTERNATIONAL CONFERENCE ON CYBORG AND BIONIC SYSTEMS, CBS, 2022, : 419 - 423
  • [50] Radioactive emission from coal-fired power plants
    Bodizs, D.
    Gaspar, L.
    Keoemley, G.
    [J]. Periodica Polytechnica, Physics and Nuclear Sciences, 1993, 1 (01):