Deformation of Compressible Layers Below Pile Foundations of a High-Speed Railway

被引:0
|
作者
Qi Yang
Fang Xu
Wuming Leng
Rusong Nie
Chunyan Zhao
Fengqi Guo
机构
[1] Central South University,School of Civil Engineering
[2] National Engineering Laboratory for High Speed Railway Construction,undefined
关键词
High-speed railway; Pile foundation; Compression deformation; Field test; Finite-element analysis;
D O I
暂无
中图分类号
学科分类号
摘要
New installation methods and techniques using single-point settlement gauges to monitor the compression deformations of pile shafts and soil layers below the pile bottom were developed. A field study was conducted at a test site of the Beijing–Shanghai high-speed railway, and a 3D finite-element analysis was performed to analyze the deformation behavior of the pile foundation. The measured compression deformations of the pile shafts from the single-point settlement gauges agreed well with the values obtained from the strain gauges, which validated the effectiveness and feasibility of the developed methods and techniques. During the construction of the high-speed railway, the pile top settlement–time curve presented a ‘ladder’ shape and then increased with time before gradually stabilizing. The compression deformations of the subsoil layers within 20–30 m below the pile bottom were not significantly different, and the average unit compression deformation under 20 m below the pile bottom remained approximately constant after construction. The axial force and tip resistance of the pile shaft increased during the consolidation of the soils surrounding the pile shaft and might result in an increase of the compressions of the pile shaft and subsoil layers. The thicknesses of compressible layers (hc) of the tested pile foundations were determined using a deformation ratio method and were approximately 15.0 m. These results demonstrate that the developed methods and techniques are useful for studying the compression deformations of subsoils below the pile bottom (especially for super-long piles).
引用
收藏
页码:881 / 895
页数:14
相关论文
共 50 条
  • [21] MODEL FOR COMPRESSIBLE TURBULENCE IN HYPERSONIC WALL BOUNDARY AND HIGH-SPEED MIXING LAYERS
    BOWERSOX, RDW
    SCHETZ, JA
    AIAA JOURNAL, 1994, 32 (07) : 1531 - 1533
  • [22] Pile foundations of Taiwan high speed rail
    Seah, T. H.
    Moh, Z. C.
    Chin, C. T.
    Duann, S. W.
    Proceedings of the 16th International Conference on Soil Mechanics and Geotechnical Engineering, Vols 1-5: GEOTECHNOLOGY IN HARMONY WITH THE GLOBAL ENVIRONMENT, 2005, : 2175 - 2178
  • [23] Geodynamics of high-speed railway
    Bian, Xuecheng
    Li, Wei
    Hu, Jing
    Liu, Hongming
    Duan, Xiang
    Chen, Yunmin
    TRANSPORTATION GEOTECHNICS, 2018, 17 : 69 - 76
  • [24] Field vibration mitigation by honeycomb WIB for pile foundations of a high-speed train viaduct
    Takemiya, H
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2004, 24 (01) : 69 - 87
  • [25] Long-term settlement prediction of high-speed railway bridge pile foundation
    杨奇
    冷伍明
    张升
    聂如松
    魏丽敏
    赵春彦
    刘维正
    Journal of Central South University, 2014, 21 (06) : 2415 - 2424
  • [26] Test study of performance of composite pile foundation of high-speed railway controlling settlement
    Xu Lin-rong
    Wang Hong-gui
    Zuo Shen
    Liu Wei-zheng
    ROCK AND SOIL MECHANICS, 2012, 33 (09) : 2605 - +
  • [27] Long-term settlement prediction of high-speed railway bridge pile foundation
    Qi Yang
    Wu-ming Leng
    Sheng Zhang
    Ru-song Nie
    Li-min Wei
    Chun-yan Zhao
    Wei-zheng Liu
    Journal of Central South University, 2014, 21 : 2415 - 2424
  • [28] Analysis of vibration mitigation for CFG pile-supported subgrade of high-speed railway
    Zhang, Jiyan
    Gao, Guangyun
    Bi, Junwei
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2023, 164
  • [29] Model test on pile-plank roadbed of high-speed railway overlying goafs
    Li Chuan-bao
    Cheng Qian-gong
    Liang Xin
    Zhang Shi-liang
    ROCK AND SOIL MECHANICS, 2014, 35 (11) : 3101 - 3110
  • [30] Long-term settlement prediction of high-speed railway bridge pile foundation
    Yang Qi
    Leng Wu-ming
    Zhang Sheng
    Nie Ru-song
    Wei Li-min
    Zhao Chun-yan
    Liu Wei-zheng
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2014, 21 (06) : 2415 - 2424