Optimal procurement strategies for contractual assembly systems with fluctuating procurement price

被引:0
|
作者
Yi Yang
Jianan Wang
Youhua Chen
Zhiyuan Chen
Yanchu Liu
机构
[1] Zhejiang University,School of Management
[2] City University of Hong Kong,College of Business
[3] Wuhan University,Economics and Management School
[4] Sun Yat-sen University,Lingnan (University) College
来源
关键词
Assembly system; Supply contracts; Spot market; Monte Carlo simulation; Leadtime;
D O I
暂无
中图分类号
学科分类号
摘要
We consider a multi-component assembly system that produces a single end product in order to satisfy the one-time demand at a (known) future time with an exogenous selling price. Components can be outsourced from outside suppliers with positive leadtimes under either time-inflexible or time-flexible contracts. One of these components, say component 1, faces an uncertainty in its procurement price, depending on the spot market price that is governed by a geometric Brownian motion, while the prices of other components are constant. Given supply contracts, the assembler needs to determine the procurement strategy to maximize the total expected profit that equals the expected revenue minus procurement cost, holding cost, and tardiness penalty cost. Under time-inflexible contracts, the problem is static and a variant of the classic newsvendor problem. We show that leadtime uncertainty will cause the assembler to be more conservative in procurement quantity, but more aggressive in procurement timing than if the leadtime is deterministic. For time-flexible contracts, we show that under certain conditions, the original problem is equivalent to an optimal single stopping problem whose optimal strategies follow either upward or downward base-price procurement policies. Under the general condition, we propose an efficient Monte Carlo simulation method to calculate the optimal solutions. Numerical studies also provide several interesting insights: first, both procurement quantity and profit are non-monotone in the leadtime length; second, the value of time-flexible contracts compared to time-inflexible contracts is close to zero if the price of component 1 has a decreasing trend, but otherwise significant.
引用
下载
收藏
页码:1027 / 1059
页数:32
相关论文
共 50 条
  • [21] SPECIAL REPORT MILITARY SYSTEMS PROCUREMENT - THE PRICE FOR MIGHT
    ADAM, JA
    IEEE SPECTRUM, 1988, 25 (12) : 24 - 25
  • [22] Characterizing solutions in optimal microgrid procurement and dispatch strategies
    Goodall, G. H.
    Hering, A. S.
    Newman, A. M.
    APPLIED ENERGY, 2017, 201 : 1 - 19
  • [23] Raw material procurement with fluctuating prices
    Arnold, Jan
    Minner, Stefan
    Eidam, Bjoern
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 121 (02) : 353 - 364
  • [24] Optimal Procurement Design of an Assembly Supply Chain with Information Asymmetry
    Fang, Xiang
    Ru, Jun
    Wang, Yunzeng
    PRODUCTION AND OPERATIONS MANAGEMENT, 2014, 23 (12) : 2075 - 2088
  • [25] PROBLEM OF OPTIMAL PROCUREMENT DISPOSITION IN IRREGULARLY FLUCTUATING RAW-MATERIAL PRICING
    HUTTEMANN, H
    ZEITSCHRIFT FUR BETRIEBSWIRTSCHAFT, 1976, 46 (09): : 647 - 670
  • [26] Price control in war procurement
    Browning, Albert J.
    CORNELL LAW QUARTERLY, 1943, 29 (02): : 149 - 175
  • [27] OPTIMAL PROCUREMENT MECHANISMS
    MANELLI, AM
    VINCENT, DR
    ECONOMETRICA, 1995, 63 (03) : 591 - 620
  • [28] SYSTEMS PROCUREMENT
    BIRCH, S
    AEROSPACE ENGINEERING, 1994, 14 (1-2) : 11 - 12
  • [29] Learning from Optimal: Energy Procurement Strategies for Data Centers
    Ahmad, Sohaib
    Rosenthal, Arielle
    Hajiesmaili, Mohammad H.
    Sitaraman, Ramesh K.
    E-ENERGY'19: PROCEEDINGS OF THE 10TH ACM INTERNATIONAL CONFERENCE ON FUTURE ENERGY SYSTEMS, 2019, : 326 - 330
  • [30] Optimal Ordering Decisions in Portfolio Procurement Considering Spot Price Fluctuation
    Luo, Gongli
    Liu, Xiaoqing
    Chan, Felix T. S.
    SUSTAINABILITY, 2023, 15 (14)