共 50 条
- [31] Solving the unit commitment problem of hydropower plants via Lagrangian Relaxation and Sequential Quadratic Programming [J]. COMPUTATIONAL & APPLIED MATHEMATICS, 2005, 24 (03): : 317 - 341
- [33] Parallel Machine Scheduling with Additional Resources: A Lagrangian-Based Constraint Programming Approach [J]. INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING FOR COMBINATORIAL OPTIMIZATION PROBLEMS, 2011, 6697 : 92 - 98
- [35] A Lagrangian Relaxation based Heuristic Approach for Steel Grade Assignment Problem [J]. IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, : 2645 - 2650
- [37] Timetable problem using constraint programming [J]. ICCC2004: Proceedings of the 16th International Conference on Computer Communication Vol 1and 2, 2004, : 1714 - 1717
- [40] AUTOMATIC RECORDING OF STRESS RELAXATION CURVES IN POLYMERS [J]. INDUSTRIAL LABORATORY, 1965, 31 (10): : 1583 - &