共 50 条
- [41] Crane and winch hoisting drum stress. [J]. ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1939, 83 : 760 - 762
- [42] Feasibility of the tower crane jib made of composite material [J]. 52ND CONFERENCE ON ENGINEERING MECHANICAL DESIGN AND STRESS ANALYSIS, AIAS 2023, 2024, 1306
- [43] Dynamic Loads on a Hydraulic Cylinder Adjusting a Crane Jib [J]. Russian Engineering Research, 2022, 42 (01): : 23 - 29
- [45] DYNAMICS OF A TOWER-CRANE HOISTING MECHANISM [J]. RUSSIAN ENGINEERING JOURNAL-USSR, 1968, 48 (08): : 26 - &
- [48] Analysis of dynamic performance on hoisting for huge-type truck crane's arm [J]. Tongji Daxue Xuebao/Journal of Tongji University, 1999, 27 (05): : 511 - 514
- [49] OPTIMUM DESIGN OF BALANCING DEVICES FOR DERRICK CRANE JIB SYSTEMS [J]. RUSSIAN ENGINEERING JOURNAL, 1980, 60 (07): : 38 - 40