Optimal Land Use Management for Soil Erosion Control by Using an Interval-Parameter Fuzzy Two-Stage Stochastic Programming Approach

被引:0
|
作者
Jing-Cheng Han
Guo-He Huang
Hua Zhang
Zhong Li
机构
[1] North China Electric Power University,MOE Key Laboratory of Regional Energy and Environmental Systems Optimization, Resources and Environmental Research Academy
[2] Stanford University,Department of Environmental Earth System Science
[3] University of Regina,Institute for Energy, Environment and Sustainable Communities
来源
Environmental Management | 2013年 / 52卷
关键词
Fuzzy sets; Land use transformation; Net benefit; Penalty; Three Gorges Reservoir; Uncertainty;
D O I
暂无
中图分类号
学科分类号
摘要
Soil erosion is one of the most serious environmental and public health problems, and such land degradation can be effectively mitigated through performing land use transitions across a watershed. Optimal land use management can thus provide a way to reduce soil erosion while achieving the maximum net benefit. However, optimized land use allocation schemes are not always successful since uncertainties pertaining to soil erosion control are not well presented. This study applied an interval-parameter fuzzy two-stage stochastic programming approach to generate optimal land use planning strategies for soil erosion control based on an inexact optimization framework, in which various uncertainties were reflected. The modeling approach can incorporate predefined soil erosion control policies, and address inherent system uncertainties expressed as discrete intervals, fuzzy sets, and probability distributions. The developed model was demonstrated through a case study in the Xiangxi River watershed, China’s Three Gorges Reservoir region. Land use transformations were employed as decision variables, and based on these, the land use change dynamics were yielded for a 15-year planning horizon. Finally, the maximum net economic benefit with an interval value of [1.197, 6.311] × 109 $ was obtained as well as corresponding land use allocations in the three planning periods. Also, the resulting soil erosion amount was found to be decreased and controlled at a tolerable level over the watershed. Thus, results confirm that the developed model is a useful tool for implementing land use management as not only does it allow local decision makers to optimize land use allocation, but can also help to answer how to accomplish land use changes.
引用
收藏
页码:621 / 638
页数:17
相关论文
共 50 条
  • [41] A New Interval Two-stage Stochastic Programming with CVaR for Water Resources Management
    Min Zhang
    Kaiyan Xi
    Water Resources Management, 2020, 34 : 3795 - 3807
  • [42] Interval-parameter semi-infinite fuzzy-stochastic mixed-integer programming approach for environmental management under multiple uncertainties
    Guo, P.
    Huang, G. H.
    WASTE MANAGEMENT, 2010, 30 (03) : 521 - 531
  • [43] Two-stage programming for land/water management and conjunctive use operations
    Marques, GF
    Lund, JR
    Howitt, RE
    GROUNDWATER QUALITY MODELING AND MANAGEMENT UNDER UNCERTAINTY, 2003, : 152 - 163
  • [44] Water resources management under dual uncertainties: a factorial fuzzy two-stage stochastic programming approach
    Yang Zhou
    Gordon Huang
    Shuo Wang
    Yuanyuan Zhai
    Xiaying Xin
    Stochastic Environmental Research and Risk Assessment, 2016, 30 : 795 - 811
  • [45] Water resources management under dual uncertainties: a factorial fuzzy two-stage stochastic programming approach
    Zhou, Yang
    Huang, Gordon
    Wang, Shuo
    Zhai, Yuanyuan
    Xin, Xiaying
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2016, 30 (03) : 795 - 811
  • [46] Optimal Nursing Home Shift Scheduling: A Two-Stage Stochastic Programming Approach
    Jiang, Shujin
    Li, Mingyang
    Hyer, Kathryn
    Kong, Nan
    2020 IEEE 16TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2020, : 132 - 137
  • [47] A two-stage interval-stochastic programming model for waste management under uncertainty
    Maqsood, M
    Huang, GH
    JOURNAL OF THE AIR & WASTE MANAGEMENT ASSOCIATION, 2003, 53 (05) : 540 - 552
  • [48] Optimal logistics planning for modular construction using two-stage stochastic programming
    Hsu, Pei-Yuan
    Angeloudis, Panagiotis
    Aurisicchio, Marco
    AUTOMATION IN CONSTRUCTION, 2018, 94 : 47 - 61
  • [49] An inexact two-stage fuzzy-stochastic programming model for water resources management
    Lu, H. W.
    Huang, G. H.
    Zeng, G. M.
    Maqsood, I.
    He, L.
    WATER RESOURCES MANAGEMENT, 2008, 22 (08) : 991 - 1016
  • [50] An Inexact Two-stage Fuzzy-stochastic Programming Model for Water Resources Management
    H. W. Lu
    G. H. Huang
    G. M. Zeng
    I. Maqsood
    L. He
    Water Resources Management, 2008, 22 : 991 - 1016