Optimal Land Use Management for Soil Erosion Control by Using an Interval-Parameter Fuzzy Two-Stage Stochastic Programming Approach

被引:0
|
作者
Jing-Cheng Han
Guo-He Huang
Hua Zhang
Zhong Li
机构
[1] North China Electric Power University,MOE Key Laboratory of Regional Energy and Environmental Systems Optimization, Resources and Environmental Research Academy
[2] Stanford University,Department of Environmental Earth System Science
[3] University of Regina,Institute for Energy, Environment and Sustainable Communities
来源
Environmental Management | 2013年 / 52卷
关键词
Fuzzy sets; Land use transformation; Net benefit; Penalty; Three Gorges Reservoir; Uncertainty;
D O I
暂无
中图分类号
学科分类号
摘要
Soil erosion is one of the most serious environmental and public health problems, and such land degradation can be effectively mitigated through performing land use transitions across a watershed. Optimal land use management can thus provide a way to reduce soil erosion while achieving the maximum net benefit. However, optimized land use allocation schemes are not always successful since uncertainties pertaining to soil erosion control are not well presented. This study applied an interval-parameter fuzzy two-stage stochastic programming approach to generate optimal land use planning strategies for soil erosion control based on an inexact optimization framework, in which various uncertainties were reflected. The modeling approach can incorporate predefined soil erosion control policies, and address inherent system uncertainties expressed as discrete intervals, fuzzy sets, and probability distributions. The developed model was demonstrated through a case study in the Xiangxi River watershed, China’s Three Gorges Reservoir region. Land use transformations were employed as decision variables, and based on these, the land use change dynamics were yielded for a 15-year planning horizon. Finally, the maximum net economic benefit with an interval value of [1.197, 6.311] × 109 $ was obtained as well as corresponding land use allocations in the three planning periods. Also, the resulting soil erosion amount was found to be decreased and controlled at a tolerable level over the watershed. Thus, results confirm that the developed model is a useful tool for implementing land use management as not only does it allow local decision makers to optimize land use allocation, but can also help to answer how to accomplish land use changes.
引用
收藏
页码:621 / 638
页数:17
相关论文
共 50 条
  • [1] Optimal Land Use Management for Soil Erosion Control by Using an Interval-Parameter Fuzzy Two-Stage Stochastic Programming Approach
    Han, Jing-Cheng
    Huang, Guo-He
    Zhang, Hua
    Li, Zhong
    [J]. ENVIRONMENTAL MANAGEMENT, 2013, 52 (03) : 621 - 638
  • [2] Optimal Water Allocation of Irrigation District Based on Interval-parameter Two-stage Stochastic Fuzzy Credibility Constrained Programming
    Yue, Qiong
    Guo, Ping
    Wang, Youzhi
    Zhang, Chenglong
    Li, Peng
    [J]. Nongye Jixie Xuebao/Transactions of the Chinese Society for Agricultural Machinery, 2019, 50 (04): : 228 - 235
  • [3] An interval-parameter mean-CVaR two-stage stochastic programming approach for waste management under uncertainty
    Dai, C.
    Cai, X. H.
    Cai, Y. P.
    Huo, Q.
    Lv, Y.
    Huang, G. H.
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2014, 28 (02) : 167 - 187
  • [4] An interval-parameter mean-CVaR two-stage stochastic programming approach for waste management under uncertainty
    C. Dai
    X. H. Cai
    Y. P. Cai
    Q. Huo
    Y. Lv
    G. H. Huang
    [J]. Stochastic Environmental Research and Risk Assessment, 2014, 28 : 167 - 187
  • [5] Interval-parameter two-stage stochastic nonlinear programming for water resources management under uncertainty
    Li, Yong P.
    Huang, Guo H.
    [J]. WATER RESOURCES MANAGEMENT, 2008, 22 (06) : 681 - 698
  • [6] Interval-parameter Two-stage Stochastic Nonlinear Programming for Water Resources Management under Uncertainty
    Yong P. Li
    Guo H. Huang
    [J]. Water Resources Management, 2008, 22 : 681 - 698
  • [7] Two-Stage Interval-Parameter Stochastic Programming Model Based on Adaptive Water Resource Management
    Qiang Fu
    Ke Zhao
    Dong Liu
    Qiuxiang Jiang
    Tianxiao Li
    Changhong Zhu
    [J]. Water Resources Management, 2016, 30 : 2097 - 2109
  • [8] Two-Stage Interval-Parameter Stochastic Programming Model Based on Adaptive Water Resource Management
    Fu, Qiang
    Zhao, Ke
    Liu, Dong
    Jiang, Qiuxiang
    Li, Tianxiao
    Zhu, Changhong
    [J]. WATER RESOURCES MANAGEMENT, 2016, 30 (06) : 2097 - 2109
  • [9] An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty
    Maqsood, M
    Huang, GH
    Yeomans, JS
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (01) : 208 - 225
  • [10] Optimal Water Resources Planning Based on Interval-parameter Two-stage Robust Stochastic Programming Model
    Chen, Hongguang
    Wang, Qiongya
    Li, Xiaoning
    Wang, Zhongjun
    Li, Chenyang
    [J]. Nongye Jixie Xuebao/Transactions of the Chinese Society for Agricultural Machinery, 2019, 50 (03): : 271 - 280