Iceberg disconnect criteria for floating production systems

被引:0
|
作者
Mark Fuglem
Paul Stuckey
Yujian Huang
John Barrett
Jan Thijssen
Tony King
Freeman Ralph
机构
[1] C-CORE,
来源
Safety in Extreme Environments | 2020年 / 2卷 / 1期
关键词
Icebergs; FPSO; Loads; Disconnect criteria; Serviceability;
D O I
10.1007/s42797-019-00007-4
中图分类号
学科分类号
摘要
In designing a floating offshore production system to operate in a region with risk of impacts from icebergs, the effectiveness of management and avoidance of detected icebergs may be considered when determining design ice loads. Management can include deflection of encroaching icebergs through towing or use of water cannon. Avoidance would typically consist of disconnecting the floater and moving off site for cases when an iceberg cannot be managed, but could also include moving off site for periods with high numbers of icebergs. There may be grounds for remaining on site in certain cases (e.g., small icebergs in low sea states) if it can be clearly demonstrated that there are no serious risks. This paper discusses issues involved when determining guidelines for remaining on site, including relevant standards and limits states, trade-offs between ice strengthening and operational requirements, and considerations when presented with a threat by a specific iceberg and set of environmental conditions. A probabilistic approach is presented for establishing operational criteria for disconnection that will still ensure target reliabilities with respect to iceberg impact loads are achieved.
引用
收藏
页码:15 / 36
页数:21
相关论文
共 50 条
  • [21] Use of floating production systems up 38%
    不详
    OIL & GAS JOURNAL, 1998, 96 (15) : 40 - 40
  • [22] ICEBERG CALVING FROM FLOATING GLACIERS BY A VIBRATING MECHANISM
    HOLDSWORTH, G
    GLYNN, J
    NATURE, 1978, 274 (5670) : 464 - 466
  • [23] Subsurface melting of a free-floating Antarctic iceberg
    Stephenson, Gordon R., Jr.
    Sprintall, Janet
    Gille, Sarah T.
    Vernet, Maria
    Helly, John J.
    Kaufmann, Ronald S.
    DEEP-SEA RESEARCH PART II-TOPICAL STUDIES IN OCEANOGRAPHY, 2011, 58 (11-12) : 1336 - 1345
  • [24] Criteria for Floating I
    Finn, Robert
    JOURNAL OF MATHEMATICAL FLUID MECHANICS, 2011, 13 (01) : 103 - 115
  • [25] Criteria for Floating I
    Robert Finn
    Journal of Mathematical Fluid Mechanics, 2011, 13 : 103 - 115
  • [26] Production availability analysis of Floating Production Storage and Offloading (FPSO) systems
    Meng, Huixing
    Kloul, Leila
    Rauzy, Antoine
    APPLIED OCEAN RESEARCH, 2018, 74 : 117 - 126
  • [27] SCANDINAVIAN PROPOSALS FOR FLOATING OFFSHORE PRODUCTION SYSTEMS - A REVIEW
    NORTH, R
    NAVAL ARCHITECT, 1984, (FEB): : E77 - &
  • [28] Installation of mooring and riser systems for floating production vessels
    Wilkinson, C.
    Cook, P.
    Frazer, I.
    Mackinnon, J.
    Johns, J.
    Bowie, M.M.
    Proceedings of the Annual Offshore Technology Conference, 1999, 3 : 171 - 178
  • [29] Deepwater remote fields rely on floating production systems
    2001, PennWell Publishing Co. (99):
  • [30] Committee V.5 - Floating production systems
    PROCEEDINGS OF THE 15TH INTERNATIONAL SHIP AND OFFSHORE STRUCTURES CONGRESS, VOL 2, 2003, : 149 - +