A collapse risk assessment method for subway foundation pit based on cloud model and improved Dempster–Shafer evidence theory

被引:0
|
作者
Bo Wu
Jiajia Zeng
Ruonan Zhu
Fan Yang
Cong Liu
Yundong Xie
机构
[1] East China University of Technology,School of Civil and Architecture Engineering
[2] East China University of Technology,School of Water Resources and Environmental Engineering
[3] Jiangxi Geological Survey Research Institute,undefined
[4] China Railway Beijing Engineering Bureau Group Urban Rail Transit Engineering Co.,undefined
[5] Ltd,undefined
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Collapse is a major engineering hazard in open-cut foundation pit construction, and risk assessment is crucial for considerably reducing engineering hazards. This study aims to address the ambiguity problem of qualitative index quantification and the failure of high-conflict evidence fusion in risk assessment. Thus, a fast-converging and high-reliability multi-source data fusion method based on the cloud model (CM) and improved Dempster–Shafer evidence theory is proposed. The method can achieve an accurate assessment of subway pit collapse risks. First, the CM is introduced to quantify the qualitative metrics. Then, a new correction parameter is defined for improving the conflicts among evidence bodies based on conflict degree, discrepancy degree and uncertainty, while a fine-tuning term is added to reduce the subjective effect of global focal element assignment. Finally, the risk assessment result is obtained according to the maximum affiliation principle. The method is successfully applied to Luochongwei Station, where the difference between the maximum value and the second largest value of the basic probability assignment is 0.624, and the global uncertainty degree is 0.087. Both values satisfy the decision evaluation condition; however, values of other methods only satisfy one or neither condition. In addition, the proposed method requires only four cycles to reach the steady state by fusing data of the same index, which has faster convergence compared with that of other methods. The proposed method has good universality and effectiveness in subway pit collapse risk assessment.
引用
收藏
相关论文
共 50 条
  • [21] Risk assessment of complex footbridge based on Dempster-Shafer evidence theory using Fuzzy matter-element method
    Lu, Pengzhen
    Zhou, Yutao
    Wu, Ying
    Li, Dengguo
    APPLIED SOFT COMPUTING, 2022, 131
  • [22] Risk Assessment Method of Deep Foundation Pit Construction Based on Two-Dimensional Cloud Model
    Huang, Zhen
    Cao, Chen
    Zhang, Wei
    Ma, Shao-Kun
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2024, 45 (10): : 1504 - 1512
  • [23] Research on Risk Assessment Method of Subway Operation Based on Cloud Model
    Li Lei
    Wu Yanhua
    Guo Ge
    Shi Jizhong
    PROCEEDINGS OF THE 35TH CHINESE CONTROL CONFERENCE 2016, 2016, : 9567 - 9572
  • [24] An efficient parallelization method of Dempster-Shafer evidence theory based on CUDA
    Zhao, Kaiyi
    Li, Li
    Chen, Zeqiu
    Li, Jiayao
    Sun, Ruizhi
    Yuan, Gang
    JOURNAL OF SUPERCOMPUTING, 2023, 79 (04): : 4582 - 4601
  • [25] Identifying Untrusted Weibo Users Based on Improved Dempster-Shafer Evidence Theory
    Jianmin X.
    Kailin W.
    Shufang W.
    Data Analysis and Knowledge Discovery, 2022, 6 (12) : 99 - 112
  • [26] Heterogeneous ensemble evaluation method of rock mass quality based on improved Dempster-Shafer evidence theory
    Zhang Hua-Jin
    Wu Shun-Chuan
    Han Long-Qiang
    Ran Zi-Jian
    ROCK AND SOIL MECHANICS, 2022, 43 : 532 - 541
  • [27] Research on emitter recognition model based on Dempster-Shafer evidence theory
    Guan, X
    He, Y
    Yi, X
    PROCEEDINGS OF THE THIRD INTERNATIONAL SYMPOSIUM ON INSTRUMENTATION SCIENCE AND TECHNOLOGY, VOL 1, 2004, : 166 - 170
  • [28] Construction Risk of Foundation Pit of Subway Station Based on Rough Set Theory and Catastrophe Progression Method
    He Jian
    Pan HaiZe
    Chen MengJie
    Miao Wei
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 21 (04): : 1615 - 1628
  • [29] Safety risk assessment model of a subway tunnel collapse system based on improved DOW-FFTA method
    Li, Wen
    Lu, Xuesong
    Wu, Menglong
    INTERNATIONAL JOURNAL OF LOW-CARBON TECHNOLOGIES, 2024, 19 : 171 - 184
  • [30] Uncertainty Modeling in Risk Assessment Based on Dempster-Shafer Theory of Evidence with Generalized Fuzzy Focal Elements
    Dutta, Palash
    FUZZY INFORMATION AND ENGINEERING, 2015, 7 (01) : 15 - 30