共 43 条
- [31] Adjustment in the main-channel geometry of the lower Yellow River before and after the operation of the Xiaolangdi Reservoir from 1986 to 2015 Journal of Geographical Sciences, 2020, 30 : 468 - 487
- [32] Reservoir Sedimentation and Transformation of Morpho-Logy in the Lower Yellow River during 10 Year’s Initial Operation of the Xiaolangdi Reservoir Journal of Hydrodynamics, 2012, 24 : 914 - 924
- [36] Beaches Ecological Protection and Safety Utilization Based on the Xiaolangdi Reservoir Flood Control of the Yellow River Lower Reach :Kaifeng Area as a Case Study PROCEEDINGS OF THE 5TH INTERNATIONAL YELLOW RIVER FORUM ON ENSURING WATER RIGHT OF THE RIVER'S DEMAND AND HEALTHY RIVER BASIN MAINTENANCE, VOL II, 2015, : 275 - 281
- [37] Development and Application of a Reservoir-Channel- Floodplain Coupling Model System for Flow and Sediment Transport in the Middle and Lower Yellow River Yingyong Jichu yu Gongcheng Kexue Xuebao/Journal of Basic Science and Engineering, 2020, 28 (03): : 652 - 665
- [39] Application of Delft3D in the Modeling of Sediment Transport and Morphological Changes of the Lower Yellow River PROCEEDINGS OF THE 2ND INTERNATIONAL YELLOW RIVER FORUM ON KEEPING HEALTHY LIFE OF THE RIVER, VOL III, 2005, : 328 - 337
- [40] Comparison of channel geometry changes in Inner Mongolian reach of the Yellow River before and after joint operation of large upstream reservoirs Journal of Geographical Sciences, 2015, 25 : 930 - 942