An innovative crane-lift path planning system for high-rise modular integrated construction

被引:0
|
作者
Aimin Zhu
Wei Pan
机构
[1] The University of Hong Kong,Department of Civil Engineering
关键词
Modular integrated construction; Tower crane; Crane-lift path planning; Particle swarm optimization; Off-site construction;
D O I
10.1007/s41693-022-00074-3
中图分类号
学科分类号
摘要
Modular integrated construction (MiC) represents the most advanced off-site technology. It is challenging to install hefty modules’ safely and effectively in high-rise building projects. Nevertheless, existing crane-lift activities are largely built on the personal experience and subjective judgements of crane operators and signalmen, which often causes time delay and safety hazards. Automatic crane-lift path planning has been demonstrated effective in addressing those issues. However, previous studies seldom considered MiC-specific characteristics such as self-rotation of lifted modules. This paper, therefore, aims to develop an innovative tower crane path planning system for assisting crane operators in high-rise MiC. This system consists of two critical components, i.e., modeling and computing. The modeling component is designed to build three types of models, i.e., original building information models, bounding box models and mathematic models, for setting up the path planning environment. The computing component is designed to work out the optimized crane-lift path using an improved particle swarm optimization algorithm based on three mechanisms, i.e., tower crane operation strategy, fitness function and collision detection. Two real-life MiC projects are used to validate the system. The results indicate that the developed system is effective and efficient in obtaining a collision-free and smooth crane-lift path using limited evolutionary generation and population size. Practically, this study with the advanced crane-lift assistance system should reduce hoisting cycle time and improve safety performance in off-site construction. Scientifically, the paper establishes a theoretical foundation for automated crane-lift path planning and contributes to the application of metaheuristics in the construction industry.
引用
收藏
页码:133 / 150
页数:17
相关论文
共 50 条
  • [31] Steel Concrete Composite Systems for Modular Construction of High-rise Buildings
    Liew, J. Y. R.
    Dai, Z.
    Chua, Y. S.
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON ADVANCES IN STEEL-CONCRETE COMPOSITE STRUCTURES (ASCCS 2018), 2018, : 59 - 65
  • [32] Steel concrete composite systems for modular construction of high-rise buildings
    Liew, J. Y. R.
    Chua, Y. S.
    Dai, Z.
    STRUCTURES, 2019, 21 : 135 - 149
  • [33] Design and construction of high-rise modular buildings based on recent projects
    Hough, Michael J.
    Lawson, R. Mark
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2019, 172 (06) : 37 - 44
  • [34] Unit modular in-fill construction method for high-rise buildings
    Hyung Keun Park
    Jong-Ho Ock
    KSCE Journal of Civil Engineering, 2016, 20 : 1201 - 1210
  • [35] Unit modular in-fill construction method for high-rise buildings
    Park, Hyung Keun
    Ock, Jong-Ho
    KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (04) : 1201 - 1210
  • [36] High-rise modular buildings with innovative precast concrete shear walls as a lateral force resisting system
    Wang, Zhen
    Pan, Wei
    Zhang, Zhiqian
    STRUCTURES, 2020, 26 : 39 - 53
  • [37] Heavy mobile crane lift path planning in congested modular industrial plants using a robotics approach
    Kayhani, Navid
    Taghaddos, Hosein
    Mousaei, Ali
    Behzadipour, Saeed
    Hermann, Ulrich
    AUTOMATION IN CONSTRUCTION, 2021, 122
  • [38] Heavy mobile crane lift path planning in congested modular industrial plants using a robotics approach
    Kayhani N.
    Taghaddos H.
    Mousaei A.
    Behzadipour S.
    Hermann U.
    Automation in Construction, 2021, 122
  • [39] An integrated approach for managing cladding construction in high-rise buildings
    Ma, ZL
    Liu, B
    Chen, WJ
    AUTOMATION IN CONSTRUCTION, 2002, 11 (05) : 545 - 555
  • [40] New forming system eases high-rise construction
    不详
    CIVIL ENGINEERING, 1997, 67 (09): : 82 - 83