Derivation of Aggregation-Based Joint Operating Rule Curves for Cascade Hydropower Reservoirs

被引:0
|
作者
Pan Liu
Shenglian Guo
Xiaowei Xu
Jionghong Chen
机构
[1] Wuhan University,State Key Laboratory of Water Resources and Hydropower Engineering Science
来源
关键词
Cascade reservoirs; Reservoir operation; Operating rules; Joint operating rule curves; Aggregated reservoir;
D O I
暂无
中图分类号
学科分类号
摘要
Operating rule curves have been widely applied to reservoir operation, due to their ease of implementation. However, these curves are generally used for single reservoirs and have rarely been applied to cascade reservoirs. This study was conducted to derive joint operating rule curves for cascade hydropower reservoirs. Steps in the proposed methodology include: (1) determining the optimal release schedule using dynamic programming to solve a deterministic long-term operation model, (2) identifying the forms of operating rule curves suitable for cascade hydropower reservoirs based on the optimal release schedule, (3) constructing a simulation-based optimization model and then using the non-dominated sorting genetic algorithm-II (NSGA-II) to identify the key points of the operating rule curves, (4) testing and verifying the efficiency of the generated joint operating rule curves using synthetic inflow series. China’s Qing River cascade hydropower reservoirs (the Shuibuya, Geheyan and Gaobazhou reservoirs) were selected for a case study. When compared with the conventional operating rule curves, the annual power generation can be increased by 2.62% (from 7.27 to 7.46 billion kWh) using the observed inflow from 1951 to 2005, as well as by about 1.77% and 2.52% using the synthetic inflows generated from two alternative hydrologic simulation methods. Linear operating rules were also implemented to simulate coordinated operation of the Qing River cascade hydropower reservoirs. The joint operating rule curves were more efficient and reliable than conventional operating rule curves and linear operating rules, indicating that the proposed method can greatly improve hydropower generation and work stability.
引用
收藏
页码:3177 / 3200
页数:23
相关论文
共 32 条
  • [21] Joint optimal dispatch of Longjiang and Ruilijiang cascade hydropower stations based on improved NSGA-Ⅱ
    Li, Lingjie
    Wang, Yintang
    Ma, Jingmei
    Zhu, Rongjin
    Hu, Qingfang
    Liu, Yong
    Water Resources Protection, 2022, 38 (02): : 83 - 90
  • [22] Joint operation of large scale hydropower system based on minimum operating water level optimisation
    Dong, Li Ji
    Taiwan Water Conservancy, 2019, 67 (03): : 24 - 38
  • [23] Stochastic optimization operation for cascade hydropower reservoirs by using precipitation forecasts I. Using aggregation-decomposition methodology to reduce high computational costs
    Peng, Y. (pengyong@dlut.edu.cn), 1600, International Research and Training Center on Erosion and Sedimentation and China Water and Power Press (44):
  • [24] Cascade reservoirs' joint optimal operation of power generation based on improved electro-search algorithm
    Wang L.-P.
    Li N.-N.
    Yan X.-R.
    Zhang Y.-K.
    Ji C.-M.
    Kongzhi yu Juece/Control and Decision, 2020, 35 (08): : 1916 - 1922
  • [25] Ecological multi-objective joint optimized scheduling of cascade hydropower plants based on improved marine predators algorithm
    Kong, Fannie
    Zhuo, Yiwen
    Song, Cheng
    JOURNAL OF RENEWABLE AND SUSTAINABLE ENERGY, 2022, 14 (04)
  • [26] Operation rule derivation of hydropower reservoir by k-means clustering method and extreme learning machine based on particle swarm optimization
    Feng, Zhong-kai
    Niu, Wen-jing
    Zhang, Rui
    Wang, Sen
    Cheng, Chun-tian
    JOURNAL OF HYDROLOGY, 2019, 576 : 229 - 238
  • [27] Applying wavelet transformation and artificial neural networks to develop forecasting-based reservoir operating rule curves
    Ashrafi, Seyed Mohammad
    Mostaghimzadeh, Ehsan
    Adib, Arash
    HYDROLOGICAL SCIENCES JOURNAL-JOURNAL DES SCIENCES HYDROLOGIQUES, 2020, 65 (12): : 2007 - 2021
  • [28] Extracting operation rule of cascade reservoirs using a novel framework considering hydrometeorological spatiotemporal information based on artificial intelligence models
    Fang, Wei
    Qin, Hui
    Shen, Keyan
    Yang, Xin
    Yang, Yuqi
    Jia, Benjun
    JOURNAL OF CLEANER PRODUCTION, 2024, 437
  • [29] Research on joint flood control operation rule of parallel reservoir group based on aggregation-decomposition method
    Pan, Zihao
    Chen, Lihua
    Teng, Xiang
    JOURNAL OF HYDROLOGY, 2020, 590
  • [30] Optimization Dispatching for Joint Operation of Hydrogen Storage-wind Power and Cascade Hydropower Station Based on Bidirectional Electricity Price Compensation
    Li X.
    Yang Y.
    Yang, Yuxiang (201808080021037@ctgu.edu.cn), 1600, Power System Technology Press (44): : 3297 - 3305