共 50 条
- [23] Using an exact solution to improve the peak outflow of NWS simplified dam break model [J]. WATER RESOURCES ENGINEERING 98, VOLS 1 AND 2, 1998, : 1008 - 1013
- [26] Prediction of Uncertainty Estimation and Confidence Calibration Using Fully Convolutional Neural Network [J]. CMC-COMPUTERS MATERIALS & CONTINUA, 2023, 75 (02): : 2557 - 2573
- [27] DISTRIBUTED ESTIMATION UNDER NETWORK MODEL UNCERTAINTY [J]. 2018 IEEE INTERNATIONAL CONFERENCE ON ACOUSTICS, SPEECH AND SIGNAL PROCESSING (ICASSP), 2018, : 3569 - 3573
- [28] Estimation of dam reservoir volume fluctuations using artificial neural network and support vector regression [J]. JOURNAL OF ENGINEERING RESEARCH, 2013, 1 (03): : 53 - 74
- [29] Designing neural network control policies under parametric uncertainty: A Koopman operator approach [J]. IFAC PAPERSONLINE, 2022, 55 (07): : 392 - 399
- [30] BOD and COD Estimation in Wastewater Outflow via Artificial Neural Network [J]. RECENT ADVANCES IN ENVIRONMENTAL SCIENCE FROM THE EURO-MEDITERRANEAN AND SURROUNDING REGIONS, VOLS I AND II, 2018, : 875 - 876