Optimum hydraulic design of cut-off under hydraulic structures using the simulation–optimization method

被引:0
|
作者
Waqed H. Hassan
Hussein H. Hussein
Duaa H. Khashan
Basim K. Nile
机构
[1] University of Kerbala,Water Resources and Environmental Engineering, Civil Engineering Department
[2] University of Warith Al-Anbiyaa,Geotechnical Engineering, Civil Engineering Department
[3] University of Kerbala,Civil Engineering Department
关键词
Seepage; Optimum hydraulic design; Finite difference method; Genetic algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
A genetic algorithm program, combined with the finite difference method (GA-FDM), was developed to obtain the optimum location of the cut-off wall under the hydraulic structures to solve the seepage issues. For the optimization formulation model, the objective function was considered to minimize the total cost of the hydraulic structure construction. The major nonlinear constraints were formulated to meet uplift pressure and exit gradient safety considerations. In two phases, the GA-FDM model provided here satisfies the criteria of an optimal hydraulic design. Initially, a numerical model that has been validated and coded using the finite difference method (FDM), was employed to investigate the seepage issue. This was followed by the use of the genetic algorithm optimization model coded by the MATLAB programming with a finite difference program as a sub-routine to find the optimum position and depth for the cut-off wall. The numerical and optimization models were linked using MATLAB code, resulting in a Simulation–Optimization (S–O) approach. According to the findings, the suggested GA-FDM approach would offer an efficient, safe and cost-effective cut-off wall design. When the proposed S–O approach is applied to determine the optimum locations and depths of the upstream and downstream cut-off walls with respect to minimizing the construction cost, the cost of the safe dam floor is reduced by 60–77%. Finally, the optimum location ratio is approximately 0.22 and 0.94 from the hydraulic structure’s floor’s toe for the upstream and downstream cut-offs, respectively.
引用
收藏
页码:493 / 505
页数:12
相关论文
共 50 条
  • [31] DIRECT CUT-OFF METHOD FOR COMBINATORIAL OPTIMIZATION PROBLEMS WITH ADDITIONAL CONSTRAINTS
    Iemets, O. O.
    Yemets, Ye. M.
    Oleksiichuk, Yu. F.
    CYBERNETICS AND SYSTEMS ANALYSIS, 2011, 47 (06) : 932 - 940
  • [32] On the Solution of Problems of Nonlinear Conditional Optimization on Arrangements by the Cut-Off Method
    O. O. Emets'
    T. M. Barbolina
    Ukrainian Mathematical Journal, 2003, 55 (5) : 729 - 738
  • [33] Hydraulic cut-off and gas recovery potential of sandstones from Tight Gas Reservoirs: A laboratory investigation
    Jeannin, L.
    Davy, C.A.
    Skoczylas, F.
    Portier, E.
    Fu, X.
    Agostini, F.
    45th US Rock Mechanics / Geomechanics Symposium, 2011,
  • [34] Editorial: Design, simulation and optimization of hydraulic machinery, volume II
    Zhou, Ling
    Zhang, Yuquan
    Tan, Lei
    Li, Xiaojun
    Kim, Jin-Hyuk
    Agarwal, Ramesh K.
    FRONTIERS IN ENERGY RESEARCH, 2023, 11
  • [35] Modeling, Simulation and Design Optimization of a Series Hydraulic Hybrid Vehicle
    Ramakrishnan, R.
    Hiremath, Somashekhar S.
    Singaperumal, M.
    ENGINEERING AND MANUFACTURING TECHNOLOGIES, 2014, 541-542 : 727 - 731
  • [36] OPTIMUM HYDRAULIC DESIGN FOR A RADIAL DIFFUSER PUMP USING ORTHOGONAL EXPERIMENTAL METHOD BASED ON CFD
    Wang, Wenjie
    Yuan, Shouqi
    Pei, Ji
    Zhang, Jinfeng
    Yuan, Jianping
    Mao, Jieyun
    PROCEEDINGS OF THE ASME FLUIDS ENGINEERING DIVISION SUMMER MEETING - 2014, VOL 1A: SYMPOSIA, 2014,
  • [37] Numerical simulation method for hydraulic fracture pressure of perforated surrounding rock under hydraulic coupling
    Zhang Y.
    Wang P.-S.
    Li D.-Y.
    Zhang Y.-K.
    Wei K.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2022, 44 (03): : 409 - 419
  • [38] Optimization analysis of group piles below rigid raft with a cut-off method
    Liang Fa-yun
    Chen Hai-bing
    ROCK AND SOIL MECHANICS, 2011, 32 : 61 - 65
  • [39] Design method of polymer cut-off wall density for earth dams based on multi-objective optimization
    Xue, Binghan
    Zhang, Shu
    Fang, Hongyuan
    Li, Manjun
    Shi, Mingsheng
    STRUCTURES, 2023, 53 : 199 - 204
  • [40] Estimation of cut-off points under complex-sampling design data
    Iparragirre, Amaia
    Barrio, Irantzu
    Aramendi, Jorge
    Arostegui, Inmaculada
    SORT-STATISTICS AND OPERATIONS RESEARCH TRANSACTIONS, 2022, 46 (01) : 137 - 158