Computer aided geometric feasible assembly sequence planning and optimizing

被引:0
|
作者
Qiang Su
机构
[1] Shanghai Jiaotong University,Department of Industrial Engineering and Management
关键词
Assembly; Geometric feasibility; Optimizing; Precedence relation; Sequence planning;
D O I
暂无
中图分类号
学科分类号
摘要
Assembly sequence planning (ASP) is the foundation of the assembly process planning and design for assembly (DFA). In ASP, geometric feasibility is the prerequisite in the valid assembly sequences searching. The assembly precedence relations’ (APRs) deriving and fulfilling are the essential tasks in the geometric feasible assembly sequence planning. In this paper, a systematical approach called geometric constraint analysis (GCA) is proposed and the corresponding software system is developed and integrated with CAD system. Using this system, only with a few mouse clicks on CAD draft, assembly precedence relations (APRs) can be derived correctly and completely. Then, all the geometric feasible assembly sequences can be inferred out automatically. Moreover, an optimal algorithm is designed and realized in the GCA method, by which, the most optimal assembly sequence in terms of the operation convenience can be found out from the immense geometric feasible sequences.
引用
收藏
页码:48 / 57
页数:9
相关论文
共 50 条
  • [41] Geometric skeleton computation enabling concurrent product engineering and assembly sequence planning
    Demoly, Frederic
    Toussaint, Luis
    Eynard, Benoit
    Kiritsis, Dimitris
    Gomes, Samuel
    COMPUTER-AIDED DESIGN, 2011, 43 (12) : 1654 - 1673
  • [42] GEOMETRIC ANALYSIS OF TIBIOFEMORAL KNEE JOINT: TOWARDS COMPUTER AIDED TREATMENT (CAT) PLANNING
    Tariq, Humera
    Faraz, Syed
    Samreen, Asia
    Amjad, Usman
    INTERNATIONAL TRANSACTION JOURNAL OF ENGINEERING MANAGEMENT & APPLIED SCIENCES & TECHNOLOGIES, 2019, 10 (03): : 423 - 433
  • [43] Computer-aided geometric design
    Rogers, DF
    IEEE ANNALS OF THE HISTORY OF COMPUTING, 1998, 20 (02) : 44 - 46
  • [44] Computer Aided Geometric Design: Preface
    Reif, U.
    Kobbelt, L.
    Computer Aided Geometric Design, 2001, 18 (05)
  • [45] OPTIMIZING SEQUENCE OF PRODUCT ASSEMBLY
    BABUSHKIN, AI
    BASHTA, AL
    BELOV, IS
    DUSHIN, BI
    AUTOMATION AND REMOTE CONTROL, 1977, 39 (09) : 1334 - 1338
  • [46] COMPUTER AIDED INSPECTION PLANNING
    Tang Xiaoqing
    CADDM, 1994, (01) : 47 - 55
  • [47] Computer aided process planning
    Bao, Han
    Robotics and Factories of the Future - Proceedings of an International Conference, 1984,
  • [48] ASSEMBLY SEQUENCE PLANNING
    SANDERSON, AC
    DEMELLO, LSH
    ZHANG, H
    AI MAGAZINE, 1990, 11 (01) : 62 - 81
  • [49] Optimizing assembly sequence planning using precedence graph-based assembly subsets prediction method
    Zhang, Nan
    Liu, Zhenyu
    Qiu, Chan
    Hu, Weifei
    Tan, Jianrong
    ASSEMBLY AUTOMATION, 2020, 40 (02) : 361 - 375
  • [50] Efficient method of assembly sequence planning based on GAAA and optimizing by assembly path feedback for complex product
    Cheng Hui
    Li Yuan
    Zhang Kai-fu
    The International Journal of Advanced Manufacturing Technology, 2009, 42 (11-12) : 1205 - 1205