A heuristic method for determining CO 2 efficiency in transportation planning

被引:1
|
作者
Nocera S. [1 ,2 ]
Maino F. [2 ]
Cavallaro F. [2 ]
机构
[1] IUAV University of Venice - Research Unit Traffic, Territory and Logistics, Dorsoduro 2206
[2] EURAC European Academy of Bozen/Bolzano - Institute for Regional Development and Location Management, Viale Druso 1
关键词
Brenner railway tunnel; CO; 2; Emissions; Heuristic; Transportation;
D O I
10.1007/s12544-012-0073-x
中图分类号
学科分类号
摘要
Background: CO 2 emissions are generally considered the most important indicator to determine the global warming effects. Their evaluation in the case of a transportation infrastructure is generally not easy and could be achieved through a separate balance. Method: This paper introduces a new heuristic method for identifying the modifications in the CO 2 emission balance, deriving from a variation in transportation supply. The focus is predominantly on the construction and on the operational phases, which are listed in all their main elements. The method compares the maintenance of the "do-nothing" option with a number of traffic scenarios resulting from the introduction of a new infrastructure and deriving from different policy measures. Case-study: The construction of the Brenner Base Tunnel is used as a case-study for the model, highlighting the role of an enlightened transport policy in the reduction of the CO 2 emissions. © 2012 The Author(s).
引用
收藏
页码:91 / 106
页数:15
相关论文
共 50 条
  • [41] A method for urban transportation planning considering induced demand
    Xu, LQ
    Jiang, F
    PROCEEDINGS OF 2002 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2002, : 2103 - 2107
  • [42] METHOD TO SIMPLIFY NETWORK REPRESENTATION IN TRANSPORTATION-PLANNING
    CHAN, Y
    TRANSPORTATION RESEARCH, 1976, 10 (03): : 179 - 191
  • [43] Active Safety Planning Method for Transportation Network Design
    Lin, Hongzhi
    COMPLEXITY, 2021, 2021
  • [44] Active Safety Planning Method for Transportation Network Design
    Lin, Hongzhi
    Complexity, 2021, 2021
  • [45] Iterative heuristic response surface method for transmission expansion planning
    Sepulveda, Marcos
    Onetto, Enrique
    Palma-Behnke, Rodrigo
    JOURNAL OF ENERGY ENGINEERING, 2007, 133 (02) : 69 - 77
  • [46] A HEURISTIC OPTIMIZATION METHOD FOR FOREST PLANNING AND DECISION-MAKING
    PUKKALA, T
    KANGAS, J
    SCANDINAVIAN JOURNAL OF FOREST RESEARCH, 1993, 8 (04) : 560 - 570
  • [47] Optimal Planning for Photovoltaic System Using a New Heuristic Method
    Ling, Jeeng-Min
    Khuong, Anh-Son
    RENEWABLE AND SUSTAINABLE ENERGY II, PTS 1-4, 2012, 512-515 : 119 - 123
  • [48] Path planning method based on skeleton extraction and heuristic algorithm
    Liu Y.
    Lu Y.
    Li P.
    Yu H.
    Wu Q.
    Du J.
    Zhongguo Guanxing Jishu Xuebao/Journal of Chinese Inertial Technology, 2023, 31 (03): : 301 - 308
  • [49] Development of Image Collection Planning Optimization Using Heuristic Method
    Bae, Heejin
    Jun, Jungnam
    Chae, TaeByeong
    KOREAN JOURNAL OF REMOTE SENSING, 2012, 28 (04) : 459 - 466
  • [50] A Heuristic Network Planning Arrangement Method Based on Priority Rule
    Yu, Haifu
    2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT SCIENCE (ICIEMS 2013), 2013, : 514 - 519