Two-stage fuzzy chance-constrained programming: application to water resources management under dual uncertainties

被引:0
|
作者
P. Guo
G. H. Huang
机构
[1] University of Regina,Environmental Systems Engineering Program
[2] University of Waterloo,Department of Civil and Environmental Engineering
关键词
Chance-constrained programming; Decision making; Fuzzy; Uncertainty; Water resources;
D O I
暂无
中图分类号
学科分类号
摘要
In this study, a two-stage fuzzy chance-constrained programming (TFCCP) approach is developed for water resources management under dual uncertainties. The concept of distribution with fuzzy probability (DFP) is presented as an extended form for expressing uncertainties. It is expressed as dual uncertainties with both stochastic and fuzzy characteristics. As an improvement upon the conventional inexact linear programming for handling uncertainties in the objective function and constraints, TFCCP has advantages in uncertainty reflection and policy analysis, especially when the input parameters are provided as fuzzy sets, probability distributions and DFPs. TFCCP integrates the two-stage stochastic programming (TSP) and fuzzy chance-constrained programming within a general optimization framework. TFCCP incorporates the pre-regulated water resources management policies directly into its optimization process to analyze various policy scenarios; each scenario has different economic penalty when the promised amounts are not delivered. TFCCP is applied to a water resources management system with three users. Solutions from TFCCP provide desired water allocation patterns, which maximize both the system’s benefits and feasibility. The results indicate that reasonable solutions were generated for objective function values and decision variables, thus a number of decision alternatives can be generated under different levels of stream flows, α-cut levels and fuzzy dominance indices.
引用
收藏
页码:349 / 359
页数:10
相关论文
共 50 条
  • [21] Optimal Reactive Power Planning Using Two-Stage Stochastic Chance-Constrained Programming
    Lopez, Julio C.
    Mantovani, J. R. S.
    Contreras Sanz, Javier
    Munoz, Jose I.
    [J]. 2013 IEEE GRENOBLE POWERTECH (POWERTECH), 2013,
  • [22] Inexact nonlinear improved fuzzy chance-constrained programming model for irrigation water management under uncertainty
    Zhang, Chenglong
    Zhang, Fan
    Guo, Shanshan
    Liu, Xiao
    Guo, Ping
    [J]. JOURNAL OF HYDROLOGY, 2018, 556 : 397 - 408
  • [23] A chance-constrained two-stage stochastic programming model for humanitarian relief network design
    Elci, Ozgun
    Noyan, Nilay
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2018, 108 : 55 - 83
  • [24] Optimal blending under general uncertainties: A chance-constrained programming approach
    Yang, Yu
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2023, 171
  • [25] A chance-constrained two-stage stochastic programming model for reliable microgrid operations under power demand uncertainty
    Marino, Carlos
    Quddus, Md Abdul
    Marufuzzaman, Mohammad
    Cowan, Mark
    Bednar, Amy E.
    [J]. SUSTAINABLE ENERGY GRIDS & NETWORKS, 2018, 13 : 66 - 77
  • [26] Inexact two-stage stochastic partial programming: application to water resources management under uncertainty
    Fan, Y. R.
    Huang, G. H.
    Guo, P.
    Yang, A. L.
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2012, 26 (02) : 281 - 293
  • [27] Inexact two-stage stochastic partial programming: application to water resources management under uncertainty
    Y. R. Fan
    G. H. Huang
    P. Guo
    A. L. Yang
    [J]. Stochastic Environmental Research and Risk Assessment, 2012, 26 : 281 - 293
  • [28] A fuzzy fractional chance-constrained programming model for air quality management under uncertainty
    Liu, Feng
    Wen, Zhi
    Xu, Ye
    [J]. ENGINEERING OPTIMIZATION, 2016, 48 (01) : 135 - 153
  • [29] Interval Double-Sided Fuzzy Chance-Constrained Programming Model for Water Resources Allocation
    Cheng, Haichun
    Li, Yongping
    Sun, Jie
    [J]. ENVIRONMENTAL ENGINEERING SCIENCE, 2018, 35 (06) : 525 - 544
  • [30] Planning Water Resources Allocation Under Multiple Uncertainties Through a Generalized Fuzzy Two-Stage Stochastic Programming Method
    Fan, Yurui
    Huang, Guohe
    Huang, Kai
    Baetz, Brian W.
    [J]. IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2015, 23 (05) : 1488 - 1504