共 50 条
- [44] JUST SECONDS REQUIRED - ANALYSES WHICH MAY BE SLOW BY CONVENTIONAL METHODS ARE COMPLETED IN SECONDS USING TOF-MS INDUSTRIAL RESEARCH, 1975, 17 (02): : 60 - 63
- [48] A Comparison of Dry Mix and Wet Mix Shortcrete Technique in the Construction of Liupanshan Tunnel 3RD INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE, ICCEASI 2015, 2015, : 820 - 826