共 50 条
- [31] Application of simulated annealing for optimization of blasting costs due to air overpressure constraints in open-pit mines JOURNAL OF MINING AND ENVIRONMENT, 2019, 10 (04): : 903 - +
- [33] Diggability assessment in open pit mines: A review Khorzoughi, Mohammad Babaei (mbabaei@alumni.ubc.ca), 1600, Inderscience Enterprises Ltd., 29, route de Pre-Bois, Case Postale 856, CH-1215 Geneva 15, CH-1215, Switzerland (07): : 181 - 209
- [36] A hybrid metaheuristic approach using random forest and particle swarm optimization to study and evaluate backbreak in open-pit blasting NEURAL COMPUTING & APPLICATIONS, 2022, 34 (08): : 6273 - 6288
- [39] PERIMETER BLASTING TECHNIQUES FOR INCREASED SLOPE STABILITY IN OPEN-PIT MINES CIM BULLETIN, 1985, 78 (875): : 67 - 67