Stress Analysis of Backup Rolls in a Wide-Strip Hot Mill Using a Modeling Method

被引:0
|
作者
Bolobanova N.L. [1 ]
Garber E.A. [1 ]
Ermushin D.Y. [1 ]
机构
[1] Cherepovets State University, Cherepovets
关键词
backup roll; finite element method; hot mill; roll stresses; roll system;
D O I
10.3103/S0967091221120020
中图分类号
学科分类号
摘要
Abstract: This paper reviews the possibilities of numerical modeling for assessing the stress of backup rolls in a 2000 continuous wide-strip hot mill. Using the finite element method implemented in the SIMULIA Abaqus system, the maximum stresses in the contact area between rolls are found to occur at the beginning of chamfers. The increase in the length of chamfers is demonstrated to reduce stresses at the body edges and slightly decrease stresses at the transition point of a flat body to a chamfer. Based on the studies conducted so far, it is proposed to use backup rolls with a chamfer length of 300 mm and a chamfer depth of up to 1 mm, if the contact length of work and backup rolls coincides with the width of rolled strips contributing the largest share in the product range of a 2000 mill at PJSC Severstal. © 2021, Allerton Press, Inc.
引用
收藏
页码:899 / 902
页数:3
相关论文
共 50 条
  • [41] Mathematical Model of Electromechanical Systems of Wide-Strip Hot-Rolling Mill Continuous Train
    Khramshin, Vadim R.
    Salganik, Viktor M.
    Zhilina, Vera A.
    Yachikov, Igor M.
    2015 INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING, AUTOMATION AND CONTROL SYSTEMS (MEACS), 2015,
  • [42] Development of a shielding system of the intermediate table of the wide-strip mill
    Ostapenko, AL
    Teslya, MD
    Zelenskii, VE
    Ivko, AF
    Shcherbak, VM
    Belobrov, YN
    Gorobets, VA
    STEEL IN TRANSLATION, 1997, 27 (02) : 39 - 45
  • [43] HEURISTIC MODEL FOR PRODUCTION SCHEDULING WIDE-STRIP ROLLING MILL
    Malindzak, D.
    Mihalikova, E.
    Pandula, B.
    METALURGIJA, 2019, 58 (1-2): : 117 - 119
  • [44] STRIP COOLING IN HOT-ROLLING ON CONTINUOUS WIDE-STRIP MILLS
    SMIRNOV, EV
    GUNKO, BA
    TISHKOV, VY
    ALYUSHIN, BA
    SERGEEV, EP
    STEEL IN THE USSR, 1980, 10 (05): : 255 - 259
  • [45] Heuristic model for production scheduling wide-strip rolling mill
    Malindžák, D.
    Mihaliková, E.
    Pandula, B.
    Metalurgija, 2019, 58 (01): : 117 - 119
  • [46] CORRELATION METHOD OF CORRECTING ALGORITHM FOR INITIAL ADJUSTMENT OF STANDS OF WIDE-STRIP MILL.
    Meshcheryakova, A.A.
    Konovalov, Yu.V.
    1600, (08):
  • [47] Evaluation of hot strip mill backup roll cladding
    Scandella, F
    Atamert, S
    Knowles, DM
    MATERIALS SCIENCE AND TECHNOLOGY, 2000, 16 (05) : 491 - 500
  • [48] INVESTIGATION OF ROLLING TEMPERATURE STABILITY ON A CONTINUOUS WIDE-STRIP MILL
    KOINOV, TA
    KLAUDITS, BO
    STEEL IN THE USSR, 1975, 5 (09): : 511 - 513
  • [49] STUDY ON SPALLING OF HOT STRIP MILL BACKUP ROLL
    OHKOMORI, Y
    KITAGAWA, I
    SHINOZUKA, K
    MIYAMOTO, R
    YAZAKI, S
    INOUE, M
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (06): : 691 - 698
  • [50] Performance improvement in rolling of hot-rolled wide strip by supplying lubricant to the backup rolls of a finishing
    Yaroslavtcev, Aleksey
    Androsenko, Mariya
    Kulikova, Ekaterina
    MATERIALS TODAY-PROCEEDINGS, 2019, 19 : 2462 - 2466