Application of chance-constrained programming for stochastic group shop scheduling problem

被引:3
|
作者
Fardin Ahmadizar
Mehdi Ghazanfari
Seyyed Mohammad Taghi Fatemi Ghomi
机构
[1] Iran University of Science and Technology,Department of Industrial Engineering
[2] Amirkabir University of Technology,Department of Industrial Engineering
关键词
Group shops scheduling; Uncertain release dates and processing times; Total weighted completion time; Chance-constrained programming; Ant colony algorithm; Heuristic algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we study a group shop scheduling (GSS) problem subject to uncertain release dates and processing times. The GSS problem is a general formulation including the other shop scheduling problems such as the flow shop, the job shop, and the open shop scheduling problems. The objective is to find a job schedule which minimizes the total weighted completion time. We solve this problem based on the chance-constrained programming. First, the problem is formulated in a form of stochastic programming and then prepared in a form of deterministic mixed binary integer linear programming such that it can be solved by a linear programming solver. To solve the problem efficiently, we develop an efficient hybrid method. Exploiting a heuristic algorithm in order to satisfy the constraints, an ant colony optimization algorithm is applied to construct high-quality solutions to the problem. The proposed approach is tested on instances where the random variables are normally, uniformly, or exponentially distributed.
引用
收藏
页码:321 / 334
页数:13
相关论文
共 50 条
  • [41] A Chance-Constrained Stochastic Electricity Market
    Dvorkin, Yury
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2020, 35 (04) : 2993 - 3003
  • [42] An Equilibrium Chance-Constrained Multiobjective Programming Model with Birandom Parameters and Its Application to Inventory Problem
    Tao, Zhimiao
    Xu, Jiuping
    JOURNAL OF APPLIED MATHEMATICS, 2013,
  • [43] ON BALUT ALGORITHM AND NP-COMPLETENESS FOR A CHANCE-CONSTRAINED SCHEDULING PROBLEM
    KISE, H
    IBARAKI, T
    MANAGEMENT SCIENCE, 1983, 29 (03) : 384 - 388
  • [44] Fuzzy chance-constrained programming for capital budgeting problem with fuzzy decisions
    Gao, JW
    Zhao, JH
    Ji, XY
    FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY, PT 1, PROCEEDINGS, 2005, 3613 : 304 - 311
  • [45] Chance-constrained programming for fuzzy quadratic minimum spanning tree problem
    Gao, JW
    Lu, M
    Liu, LZ
    2004 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS, VOLS 1-3, PROCEEDINGS, 2004, : 983 - 987
  • [46] A CHANCE-CONSTRAINED STOCHASTIC MODEL PREDICTIVE CONTROL PROBLEM WITH DISTURBANCE FEEDBACK
    Tan, Yuan
    Cao, Qingyuan
    Li, Lan
    Hu, Tianshi
    Su, Min
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2021, 17 (01) : 67 - 79
  • [47] Chance-constrained stochastic programming under variable reliability levels with an application to humanitarian relief network design
    Elci, Ozgun
    Noyan, Nilay
    Bulbul, Kerem
    COMPUTERS & OPERATIONS RESEARCH, 2018, 96 : 91 - 107
  • [48] Stochastic vendor selection problem: chance-constrained model and genetic algorithms
    Shiwei He
    Sohail S. Chaudhry
    Zhonglin Lei
    Wang Baohua
    Annals of Operations Research, 2009, 168
  • [49] Stochastic vendor selection problem: chance-constrained model and genetic algorithms
    He, Shiwei
    Chaudhry, Sohail S.
    Lei, Zhonglin
    Wang Baohua
    ANNALS OF OPERATIONS RESEARCH, 2009, 168 (01) : 169 - 179
  • [50] Two-stage interval stochastic chance-constrained robust programming and its application in flood management
    Ding, Xiaowen
    Hua, Dongxu
    Jiang, Guihong
    Bao, Zhengfeng
    Yu, Lei
    JOURNAL OF CLEANER PRODUCTION, 2017, 167 : 908 - 918