Integrated planning of spare parts and service engineers with partial backlogging

被引:0
|
作者
S. Rahimi-Ghahroodi
A. Al Hanbali
W. H. M. Zijm
J. K. W. van Ommeren
A. Sleptchenko
机构
[1] University of Twente,Department Industrial Engineering and Business Information Systems, Faculty of Behavioural, Management and Social Sciences
[2] University of Twente,Department of Applied Mathematics, Faculty of Electrical Engineering, Mathematics and Computer Science
[3] College of Engineering,Department of Mechanical and Industrial Engineering
[4] Qatar University,undefined
来源
OR Spectrum | 2017年 / 39卷
关键词
Maintenance logistics; Queueing; Spare parts inventory; Field service; Approximate evaluation; Heuristic optimization;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we consider the integrated planning of resources in a service maintenance logistics system in which spare parts supply and service engineers deployment are considered simultaneously. The objective is to determine close-to-optimal stock levels as well as the number of service engineers that minimize the total average costs under a maximum total average waiting time constraint. When a failure occurs, a spare part and a service engineer are requested for the repair call. In case of a stock-out at spare parts inventory, the repair call will be satisfied entirely via an emergency channel with a fast replenishment time but at a high cost. However, if the requested spare part is in stock, the backlogging policy is followed for engineers. We model the problem as a queueing network. An exact method and two approximations for the evaluation of a given policy are presented. We exploit evaluation methods in a greedy heuristic procedure to optimize this integrated planning. In a numerical study, we show that for problems with more than five types of spare parts it is preferable to use approximate evaluations as they become significantly faster than exact evaluation. Moreover, approximation errors decrease as problems get larger. Furthermore, we test how the greedy optimization heuristic performs compared to other discrete search algorithms in terms of total costs and computation times. Finally, in a rather large case study, we show that we may incur up to 27% cost savings when using the integrated planning as compared to a separated optimization.
引用
收藏
页码:711 / 748
页数:37
相关论文
共 50 条
  • [41] Integrated Location-Inventory Optimization in Spare Parts Networks
    Zech, Patrick
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2016, 2018, : 37 - 42
  • [42] Optimal service parts contract with multiple response times and on-site spare parts
    Mo, Daniel Y.
    Wang, Yue
    Leung, Lawrence C.
    Tseng, Mitchell M.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (10) : 3049 - 3065
  • [43] SPARE PARTS INVENTORY PLANNING FOR A REDUNDANT SYSTEM SUBJECT TO A PHASED MISSION
    VUJOSEVIC, M
    PETROVIC, R
    SENBORN, A
    [J]. ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1990, 19 (1-3): : 385 - 389
  • [44] Ways to Improve the System of Planning of the Manufacture and Distribution of Spare Parts.
    Berzin', I.E.
    Razumova, E.I.
    [J]. Izvestiya Vysshikh Uchebnykh Zavedenii, Mashinostroenie, 1974, (05): : 175 - 179
  • [45] Dynamic planning technology of civil spare parts based on aircraft state
    Kang, Zixu
    Zhou, Dong
    Li, Huixin
    Guo, Ziyue
    Chen, Chengzhang
    Song, Zicheng
    [J]. Beijing Hangkong Hangtian Daxue Xuebao/Journal of Beijing University of Aeronautics and Astronautics, 2024, 50 (01): : 276 - 285
  • [46] Critical project planning and spare parts inventory management in shutdown maintenance
    Zhu, Sha
    van Jaarsveld, Willem
    Dekker, Rommert
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2022, 219
  • [47] Maintenance Planning and Spare Parts Provisioning for a Small Unmanned Aerial System
    McLellan, David A.
    Schneider, Kellie
    [J]. 2017 ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2017,
  • [48] Operating environment based maintenance and spare parts planning: A case study
    Ghodrati, B
    Kumar, U
    [J]. Advanced Reliability Modeling, 2004, : 125 - 132
  • [49] Forecasting and Purchasing Planning for Shelf Life-Limited Spare Parts
    Kitti-udomporn, Sasithorn
    Sukchareonpong, Pichit
    Witchakul, Suwitchaporn
    [J]. PROCEEDINGS OF 2018 5TH INTERNATIONAL CONFERENCE ON BUSINESS AND INDUSTRIAL RESEARCH (ICBIR): SMART TECHNOLOGY FOR NEXT GENERATION OF INFORMATION, ENGINEERING, BUSINESS AND SOCIAL SCIENCE, 2018, : 264 - 269
  • [50] Critical project planning and spare parts inventory management in shutdown maintenance
    Zhu, Sha
    van Jaarsveld, Willem
    Dekker, Rommert
    [J]. Reliability Engineering and System Safety, 2022, 219