Reliability Assessment of Hydraulic Structures

被引:1
|
作者
Ginzburg S.M. [1 ]
Yudelevich A.M. [1 ]
机构
[1] JSC “VNIIG im B. E. Vedeneeva”, St. Petersburg
来源
Ginzburg, S.M. (GinzburgSM@vniig.ru) | 1600年 / Springer卷 / 54期
关键词
design models; expert assessments; hydraulic structures; limit states; probabilistic methods; reliability; technical diagnostics; theory of possibilities;
D O I
10.1007/s10749-021-01289-0
中图分类号
学科分类号
摘要
Methods for assessing the reliability of hydraulic structures at various stages of their life cycle (design, construction, operation) are considered. The solution to these problems requires a systematic approach consisting in a set of methods for studying objects and their subsystems, in particular, those of the structure and foundation. According to the principle of the non-admission of limit states, a transition from deterministic values impacting on the structure and characteristics of design models to their random, fuzzy equivalents—and, subsequently, to the use of diagnostic methods and expert assessments—was demonstrated to ensure reliability under conditions of greater uncertainty of initial data. © 2021, Springer Science+Business Media, LLC, part of Springer Nature.
引用
收藏
页码:793 / 801
页数:8
相关论文
共 50 条
  • [21] Reliability analysis of hydraulic structures considering unit hydrograph uncertainty
    Zhao, B
    Tung, YK
    Yeh, KC
    Yang, JC
    STOCHASTIC HYDROLOGY AND HYDRAULICS, 1997, 11 (01): : 33 - 50
  • [22] Provision of reliability and safety of hydraulic structures of the paz hydroelectric stations
    Power Technology and Engineering, 1996, 30 (06): : 368 - 371
  • [23] RELIABILITY AND SAFETY INSPECTION OF HYDRAULIC STRUCTURES OF THE MOSCOW CANAL.
    Ni, V.E.
    Hydrotechnical Construction, 1987, 21 (06): : 322 - 330
  • [24] RELIABILITY ASSESSMENT OF A SUBSEA ELECTRO-HYDRAULIC CONTROL SYSTEM
    Martins Silva, Antonio Hevertton
    da Hora, Henrique
    Fernandes, Rodrigo
    IRF2018: PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INTEGRITY-RELIABILITY-FAILURE, 2018, : 1031 - 1038
  • [25] Reliability assessment of hydraulic shovel system using fault trees
    Samanta, B
    Sarkar, B
    Mukherjee, SK
    TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2002, 111 : A129 - A135
  • [26] Rapid assessment of turbulence for feasibility design of hydraulic structures
    Hoeve, J. B.
    Voortman, H. G.
    Ribberink, J. S.
    Warmink, J. J.
    Uijttewaal, W. S. J.
    RIVER FLOW 2016, 2016, : 2038 - 2046
  • [27] Target reliability levels for assessment of existing structures
    Sykora, M.
    Holicky, M.
    Markova, J.
    APPLICATIONS OF STATISTICS AND PROBABILITY IN CIVIL ENGINEERING, 2011, : 1048 - 1056
  • [28] Assessment of reliability of aging reinforced concrete structures
    Hong, HP
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 2000, 126 (12): : 1458 - 1465
  • [29] Reliability based assessment of existing masonry structures
    Maes, MA
    Schueremans, L
    Van Balen, K
    APPLICATIONS OF STATISTICS AND PROBABILITY, VOLS 1 AND 2: CIVIL ENGINEERING RELIABILITY AND RISK ANALYSIS, 2000, : 689 - 695
  • [30] Heuristic Operator for Reliability Assessment of Frame Structures
    Kaveh, Ali
    Vaez, Seyed Rohollah Hoseini
    Hosseini, Pedram
    Fathali, Mohammad Ali
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2021, 65 (03): : 702 - 716