An integrated design method for remanufacturing process based on performance demand

被引:0
|
作者
Chao Ke
Zhigang Jiang
Shuo Zhu
Yan Wang
机构
[1] Wuhan University of Science and Technology,Hubei Key Laboratory of Mechanical Transmission and Manufacturing Engineering
[2] Wuhan University of Science and Technology,Key Laboratory of Metallurgical Equipment and Control Technology
[3] Wuhan University of Science and Technology,Academy of Green Manufacturing Engineering
[4] University of Brighton,Department of Computing, Engineering and Mathematics
关键词
Remanufacturing process; Performance; BPNN; TRIZ;
D O I
暂无
中图分类号
学科分类号
摘要
Design for remanufacturing process (DFRP) plays a key role in implementing remanufacturing because it directly affects the performance recovery of the End-of-Life (EoL) products. Since the used parts of EoL products have various failure forms and defects, which make it hard to rapidly generate remanufacturing process scheme to satisfy the performance demand of the remanufactured products. Moreover, remanufacturing process parameters are prone to conflicts during remanufacturing processes, often leading to unsatisfactory remanufacturing processes. To accurately generate remanufacturing process scheme and solve the conflicts, an integrated design method for remanufacturing processes based on performance demand is proposed, which reuses the historical remanufacturing process data to generate the remanufacturing process scheme. Firstly, the Kansei Engineering (KE) and Quality Functional Development (QFD) are applied to analyze the performance demand data and map the demands to the engineering features. Then, Back Propagation Neural Network (BPNN) is applied to inversely generate the remanufacturing process scheme rapidly to satisfy the performance demands by reusing the historical remanufacturing process data. Meanwhile, Theory of Constraint (TOC) and TRIZ are used to identify and solve the conflicts of the remanufacturing process for the remanufacturing process scheme optimization. Finally, the DFRP of an EoL guide rail is taken as an example to demonstrate the effectiveness of the proposed method, the result of which shows the design method can quickly and efficiently generate the remanufacturing process scheme.
引用
收藏
页码:849 / 863
页数:14
相关论文
共 50 条
  • [41] Design for manufacture based on an integrated product process design model
    Voswinckel, H.
    Schleifenbaum, H.
    Bambach, M.
    Hirt, G.
    [J]. SHEET METAL 2011, 2011, 473 : 799 - +
  • [42] A knowledge-based method for eco-efficiency upgrading of remanufacturing process planning
    Daojia Chen
    Zhigang Jiang
    Shuo Zhu
    Hua Zhang
    [J]. The International Journal of Advanced Manufacturing Technology, 2020, 108 : 1153 - 1162
  • [43] Spraying Method and Optimization of Process Parameters for Remanufacturing Profiled Workpieces Based on Coating Model
    Xia X.
    Yang Y.
    Wang L.
    Cao J.
    Liu X.
    [J]. Wang, Lei (wanglei1987@wust.edu.cn), 2018, Chinese Mechanical Engineering Society (54): : 215 - 224
  • [44] An intelligent design for remanufacturing method based on vector space model and case-based reasoning
    Ke, Chao
    Jiang, Zhigang
    Zhang, Hua
    Wang, Yan
    Zhu, Shuo
    [J]. JOURNAL OF CLEANER PRODUCTION, 2020, 277 (277)
  • [45] A DECOMPOSITION METHOD FOR PRODUCTION PLANNING UNDER DEMAND UNCERTAINTY IN WOOD REMANUFACTURING
    Rafiei, Rezvan
    Nourelfath, Mustapha
    Santa-Eulalia, Luis Antonio
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2021, 28 (06): : 594 - 607
  • [46] Development of an optimal method for remanufacturing process plan selection
    [J]. Jiang, Z. (jzg100@163.com), 1600, Springer London (72): : 9 - 12
  • [47] An energy-efficient method of laser remanufacturing process
    Jiang, Xingyu
    Tian, Zhiqiang
    Liu, Weijun
    Tian, Guangdong
    Gao, Yun
    Xing, Fei
    Suo, Yingqi
    Song, Boxue
    [J]. SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2022, 52
  • [48] Controlling Remanufacturing Time Based on Markov Process
    Yang Xiaoyan
    Gao Fenglian
    [J]. 2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 1, PROCEEDINGS, 2009, : 176 - 178
  • [49] Development of an optimal method for remanufacturing process plan selection
    Zhigang Jiang
    Zhou Fan
    John W. Sutherland
    Hua Zhang
    Xugang Zhang
    [J]. The International Journal of Advanced Manufacturing Technology, 2014, 72 : 1551 - 1558
  • [50] Seismic strength demand for performance-based design
    Lu, Yong
    Wei, Janwu
    [J]. ISISS 2005: Innovation & Sustainability of Structures, Vol 1-3, 2005, : 1631 - 1642