An integrated design method for remanufacturing process based on performance demand

被引:0
|
作者
Chao Ke
Zhigang Jiang
Shuo Zhu
Yan Wang
机构
[1] Wuhan University of Science and Technology,Hubei Key Laboratory of Mechanical Transmission and Manufacturing Engineering
[2] Wuhan University of Science and Technology,Key Laboratory of Metallurgical Equipment and Control Technology
[3] Wuhan University of Science and Technology,Academy of Green Manufacturing Engineering
[4] University of Brighton,Department of Computing, Engineering and Mathematics
关键词
Remanufacturing process; Performance; BPNN; TRIZ;
D O I
暂无
中图分类号
学科分类号
摘要
Design for remanufacturing process (DFRP) plays a key role in implementing remanufacturing because it directly affects the performance recovery of the End-of-Life (EoL) products. Since the used parts of EoL products have various failure forms and defects, which make it hard to rapidly generate remanufacturing process scheme to satisfy the performance demand of the remanufactured products. Moreover, remanufacturing process parameters are prone to conflicts during remanufacturing processes, often leading to unsatisfactory remanufacturing processes. To accurately generate remanufacturing process scheme and solve the conflicts, an integrated design method for remanufacturing processes based on performance demand is proposed, which reuses the historical remanufacturing process data to generate the remanufacturing process scheme. Firstly, the Kansei Engineering (KE) and Quality Functional Development (QFD) are applied to analyze the performance demand data and map the demands to the engineering features. Then, Back Propagation Neural Network (BPNN) is applied to inversely generate the remanufacturing process scheme rapidly to satisfy the performance demands by reusing the historical remanufacturing process data. Meanwhile, Theory of Constraint (TOC) and TRIZ are used to identify and solve the conflicts of the remanufacturing process for the remanufacturing process scheme optimization. Finally, the DFRP of an EoL guide rail is taken as an example to demonstrate the effectiveness of the proposed method, the result of which shows the design method can quickly and efficiently generate the remanufacturing process scheme.
引用
收藏
页码:849 / 863
页数:14
相关论文
共 50 条
  • [1] An integrated design method for remanufacturing process based on performance demand
    Ke, Chao
    Jiang, Zhigang
    Zhu, Shuo
    Wang, Yan
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2022, 118 (3-4): : 849 - 863
  • [2] Integrated Design of Process-Tolerance for Remanufacturing Based on Failure Feature
    Chen, Yanxiang
    Jiang, Zhigang
    Zhang, Hua
    Yan, Wei
    [J]. APPLIED SCIENCES-BASEL, 2021, 11 (14):
  • [3] An Integrated Design Method for Used Product Remanufacturing Process Based on Multi-Objective Optimization Model
    Ke, Chao
    Chen, Yanxiang
    Gan, Muyang
    Liu, Yang
    Ji, Qunjing
    [J]. PROCESSES, 2024, 12 (03)
  • [4] A remanufacturing process optimization method based on integrated fuzzy QFD and FMEA
    Shi J.
    Ren M.
    Shu F.
    Xu H.
    Cui J.
    [J]. Journal of Remanufacturing, 2023, 13 (2) : 121 - 136
  • [5] Design for Remanufacturing and Remanufacturability Based on Process
    Yao, Jukun
    Zhu, Sheng
    Cui, Peizhi
    [J]. PRODUCT DESIGN AND MANUFACTURING, 2011, 338 : 18 - +
  • [6] An Integrated Optimization Decision Method for Remanufacturing Process Based on Conditional Evidence Theory Under Uncertainty
    Bao, Zongke
    Li, Wenyi
    Gao, Mengdi
    Liu, Conghu
    Zhang, Xugang
    Cai, Wei
    [J]. IEEE ACCESS, 2020, 8 : 221119 - 221126
  • [7] ADDITIVE REMANUFACTURING INTEGRATED DESIGN APPROACH FOR PERFORMANCE IMPROVEMENT OF AUTOMOTIVE COMPONENTS
    Dalpadulo, Enrico
    Pini, Fabio
    Leali, Francesco
    [J]. PROCEEDINGS OF ASME 2022 INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, IMECE2022, VOL 4, 2022,
  • [8] Study on Design for Remanufacturing Facing Total Remanufacturing Process
    Yao, Jukun
    Zhu, Sheng
    Cui, Peizhi
    Shi, Xiaojun
    [J]. ADVANCED ENGINEERING MATERIALS, PTS 1-3, 2011, 194-196 : 581 - +
  • [9] A Design Method of Predecisional Remanufacturing Based on Structural Similarity
    Ke, Qingdi
    Lv, Yan
    Song, Shouxu
    [J]. 24TH CIRP CONFERENCE ON LIFE CYCLE ENGINEERING, 2017, 61 : 206 - 211
  • [10] Performance Analysis in Remanufacturing with Uncertain Return and Demand
    Zhang Fu-an
    Da Qing-li
    [J]. PROCEEDINGS OF THE 2011 INTERNATIONAL CONFERENCE ON INFORMATICS, CYBERNETICS, AND COMPUTER ENGINEERING (ICCE2011), VOL 2: INFORMATION SYSTEMS AND COMPUTER ENGINEERING, 2011, 111 : 359 - 365