An integrated scheduling approach considering dispatching strategy and conflict-free route of AMRs in flexible job shop

被引:0
|
作者
Jiaojiao Liu
Baofeng Sun
Gendao Li
Yuqi Chen
机构
[1] Jilin University,Transportation College
[2] Changchun University of Science and Technology,School of Economics and Management
关键词
Integrated scheduling with machines and AMRs in flexible job shop; Conflict-free route planning; Dispatching strategy for the AMR; Bi-level programming model; Self-learning genetic algorithm based on Q-learning; Dijkstra with time window;
D O I
暂无
中图分类号
学科分类号
摘要
To reveal the profound impact of dispatching strategy and route of autonomous mobile robot (AMR) on scheduling in the flexible job shop with AMRs, this study presents the bi-level programming model for integrated scheduling with machines and AMRs (ISMV), subdividing distributed shared dispatching strategy (DSDS) and following dispatching strategy (FDS) for AMRs. The integrated scheduling model is developed at the upper level with the objective of minimizing the makespan, and the AMR conflict-free route planning (CFRP) model is formulated at the lower level to minimize travel time. To solve the model, a novel algorithmic framework (SLGA-D) composed of the self-learning genetic algorithm (SLGA) and Dijkstra with time window (DijkstraTW) is designed. The SLGA is formed by embedding the Q-learning into genetic algorithm to intelligently adjust crossover probability and mutation probability. Several experiments are implemented to validate the SLGA-D and the model proposed in this study. The results of experiments prove that reinforcement learning mechanism within Q-learning successfully enhances the global search ability of the algorithm, and production scheduling and distribution route are optimized synergistically by the model. Sensitivity analyses reveal that, as the number of AMRs rises, the makespan tends to stabilize after decreasing rapidly to a threshold value. Once the number of AMRs exceeds a certain threshold (w=5\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$w = 5$$\end{document} in this study), it is not significant to shorten the makespan by continuing to invest AMRs. When the number of production tasks to be processed does not exceed the number of AMRs, following dispatching strategy of AMR is more favorable; conversely, distributed shared dispatching strategy is superior. The results provide guideline and inspiration for managers who are committed to manufacturing schedule and control.
引用
收藏
页码:1979 / 2002
页数:23
相关论文
共 50 条
  • [31] An effective approach for the dual-resource flexible job shop scheduling problem considering loading and unloading
    Wu, Xiuli
    Peng, Junjian
    Xiao, Xiao
    Wu, Shaomin
    JOURNAL OF INTELLIGENT MANUFACTURING, 2021, 32 (03) : 707 - 728
  • [32] An Integrated Optimization Algorithm of Cutting Parameters and Scheduling for Flexible Job Shop
    Huang, Yuying
    Ma, Yajie
    Jiang, Bin
    Guan, Li
    Zhou, Jiangnan
    Zhang, Haoyang
    Proceedings of 2023 CAA Symposium on Fault Detection, Supervision and Safety for Technical Processes, SAFEPROCESS 2023, 2023,
  • [33] Reactive scheduling approach for solving a realistic flexible job shop scheduling problem
    Mihoubi, B.
    Bouzouia, B.
    Gaham, M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (19) : 5790 - 5808
  • [34] FLEXIBLE JOB-SHOP SCHEDULING WITH EXTENDED ROUTE FLEXIBILITY FOR SEMICONDUCTOR MANUFACTURING
    Knopp, Sebastian
    Dauzere-Peres, Stephane
    Yugma, Claude
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 2478 - 2489
  • [35] Improved Genetic Algorithm Integrated with Scheduling Rules for Flexible Job Shop Scheduling Problems
    Amjad, Muhammad Kamal
    Butt, Shahid Ikramullah
    Anjum, Naveed
    5TH INTERNATIONAL CONFERENCE ON POWER, ENERGY AND MECHANICAL ENGINEERING (ICPEME 2021), 2021, 243
  • [36] An improved SFLA for flexible job shop scheduling problem considering energy consumption
    Zhang, Xiaoxing
    Ji, Zhicheng
    Wang, Yan
    MODERN PHYSICS LETTERS B, 2018, 32 (34-36):
  • [37] Flexible job shop scheduling considering tight front constraints and transportation time
    Zhu G.
    Wang H.
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2022, 50 (06): : 139 - 148
  • [38] An integrated approach for remanufacturing job shop scheduling with routing alternatives
    Li, Lingling
    Li, Congbo
    Li, Li
    Tang, Ying
    Yang, Qingshan
    MATHEMATICAL BIOSCIENCES AND ENGINEERING, 2019, 16 (04) : 2063 - 2085
  • [39] Flexible job shop dual resource scheduling problem considering loading and unloading
    Wu X.-L.
    Xiao X.
    Zhao N.
    Kongzhi yu Juece/Control and Decision, 2020, 35 (10): : 2475 - 2485
  • [40] Dynamic scheduling in flexible job shop systems by considering simultaneously efficiency and stability
    Fattahi, Parviz
    Fallahi, Alireza
    CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY, 2010, 2 (02) : 114 - 123