Bi-objective hybrid flow shop scheduling with common due date

被引:0
|
作者
Zhi Li
Ray Y. Zhong
Ali Vatankhah Barenji
J. J. Liu
C. X. Yu
George Q. Huang
机构
[1] School of Electromechanical Engineering,Guangdong Provincial Key Laboratory of Computer Integrated Manufacturing System
[2] Guangdong University of Technology,Department of Industrial and Manufacturing Systems Engineering
[3] The University of Hong Kong,Academy of Chinese Energy Strategy
[4] China University of Petroleum-Beijing,undefined
来源
Operational Research | 2021年 / 21卷
关键词
Hybrid flow shop scheduling; Multi-objective; Genetic algorithm; Common due date;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, the problem of hybrid flow shop scheduling with common due dates (HFSCDD) is studied, and the objectives are to minimize the total waiting time and the total earliness/tardiness issues that arise. This study was motivated by a real-life shop floor, with the predefined goal of meeting the requirements of the final product in many manufacturing industries. Where the final product is assembled from multiple components and, the assembly is only initiated when all components of the product are complete in number. These interrelated components have common due dates. In this study, we developed a mathematical model of HFSCDD which made up of “n” jobs that were processed in “m” machines, located on “I” stages by taking into consideration the common due dates. This problem is classified as being NP-hard, and so an efficient modified genetic algorithm is developed to solve it. The proposed modify GA is developed based on the NSGA II method for large sized problems. The results of the proposed algorithm have been compared with PSO and GA algorithms and showed that the proposed algorithm achieved better performance than existing solutions, since the waiting time and the earliness/tardiness are significantly reduced. This is facilitated by the simultaneous production of components for the same product.
引用
收藏
页码:1153 / 1178
页数:25
相关论文
共 50 条
  • [41] RNN Modelling for Bi-objective MPM Job Shop Scheduling Problem
    Tselios, Dimitrios
    Savvas, Ilias
    Kechadi, M-Tahar
    2013 FIFTH INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE, COMMUNICATION SYSTEMS AND NETWORKS (CICSYN), 2013, : 13 - 18
  • [42] An efficient bi-objective algorithm to solve re-entrant hybrid flow shop scheduling with learning effect and setup times
    S. M. Mousavi
    I. Mahdavi
    J. Rezaeian
    M. Zandieh
    Operational Research, 2018, 18 : 123 - 158
  • [43] A new hybrid multi-objective Pareto archive PSO algorithm for a bi-objective job shop scheduling problem
    Tavakkoli-Moghaddam, R.
    Azarkish, M.
    Sadeghnejad-Barkousaraie, A.
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (09) : 10812 - 10821
  • [44] Decentralized Production Planning Using Collaborative Agents for a Bi-Objective Reentrant Hybrid Flow Shop
    Okpoti, Evans Sowah
    Jeong, In-Jae
    2019 IEEE 6TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2019, : 198 - 202
  • [45] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Carman K. M. Lee
    Danping Lin
    William Ho
    Zhang Wu
    The International Journal of Advanced Manufacturing Technology, 2011, 56 : 1105 - 1113
  • [46] Bi-objective optimization of flexible flow shop scheduling problem with multi-skilled human resources
    Fekri, Masoud
    Heydari, Mehdi
    Mazdeh, Mohammad Mahdavi
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2024, 133
  • [47] Gravitational Search Algorithm Optimization for Bi-Objective Flow Shop Scheduling using Weighted Dispatching Rules
    Lee, T. S.
    Loong, Y. T.
    Moslemipour, G.
    2017 7TH IEEE INTERNATIONAL CONFERENCE ON CONTROL SYSTEM, COMPUTING AND ENGINEERING (ICCSCE), 2017, : 127 - 132
  • [48] Bi-objective carbon-efficient distributed flow-shop scheduling with multistep electricity pricing
    Yu, Xianyu
    Du, Hengte
    Zhou, Dequn
    Wang, Qunwei
    Lin, Guohui
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (18) : 6842 - 6858
  • [49] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Lee, Carman K. M.
    Lin, Danping
    Ho, William
    Wu, Zhang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1105 - 1113
  • [50] Multi-factory Job Shop Scheduling With Due Date Objective
    Lohmer, Jacob
    Spengler, Daniel
    Lasch, Rainer
    2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 79 - 84