Effects of storage block layout and automated yard crane systems on the performance of seaport container terminals

被引:0
|
作者
Nils Kemme
机构
[1] University of Hamburg,Institute for Operations Research
来源
OR Spectrum | 2012年 / 34卷
关键词
Container terminal; Terminal design; Block dimensions; Automated stacking cranes; Rail-mounted-gantry-crane systems; Simulation;
D O I
暂无
中图分类号
学科分类号
摘要
As a decoupling point between waterside and landside transport, the container yard plays a major role for the competitiveness of container terminals. One of the latest trends in container yard operations is the automated rail-mounted-gantry-crane system, which offers dense stacking along with high productivity. In this paper, the strategic design of rail-mounted-gantry-crane systems is investigated. A simulation study is conducted to evaluate the effects of four rail-mounted-gantry-crane systems and 385 yard block layouts—differing in block length, width, and height—on the yard and terminal performance.
引用
收藏
页码:563 / 591
页数:28
相关论文
共 50 条
  • [21] AGV dispatching strategies at automated seaport container terminals
    Guenther, Hans-Otto
    Grunow, Martin
    Lehmann, Matthias
    OPERATIONS RESEARCH AND ITS APPLICATIONS, 2005, 5 : 48 - 64
  • [22] Storage Yard Management in Maritime Container Terminals
    Jin, Jian Gang
    Lee, Der-Horng
    Cao, Jin Xin
    TRANSPORTATION SCIENCE, 2016, 50 (04) : 1300 - 1313
  • [23] Comparing the Efficiency of Two Types of Yard Layout in Container Terminals
    Zhang, Xiaoju
    Gu, Yue
    Yang, Yuqing
    Liu, Baoli
    SUSTAINABILITY, 2023, 15 (09)
  • [24] Yard Operations and Management in Automated Container Terminals: A Review
    Yu, Hang
    Deng, Yiyun
    Zhang, Leijie
    Xiao, Xin
    Tan, Caimao
    SUSTAINABILITY, 2022, 14 (06)
  • [25] Optimization of yard remarshalling operations in automated container terminals
    Wang, Yu
    He, Junliang
    Yu, Hang
    Guo, Yongkai
    ADVANCED ENGINEERING INFORMATICS, 2024, 61
  • [26] Performance Comparison of Real-Time Yard Crane Dispatching Strategies at Nontransshipment Container Terminals
    Yu, Xuhui
    Tang, Guolei
    Guo, Zijian
    Song, Xiangqun
    Yu, Jingjing
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2018, 2018
  • [27] Yard Crane Scheduling for container storage, retrieval, and relocation
    Galle, Virgile
    Barnhart, Cynthia
    Jaillet, Patrick
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 271 (01) : 288 - 316
  • [28] A job grouping approach for planning container transfers at automated seaport container terminals
    Yuan, S.
    Skinner, B. T.
    Huang, S.
    Liu, D. K.
    Dissanayake, G.
    Lau, H.
    Pagac, D.
    ADVANCED ENGINEERING INFORMATICS, 2011, 25 (03) : 413 - 426
  • [29] A SIMULATION BASED HYBRID ALGORITHM FOR YARD CRANE DISPATCHING IN CONTAINER TERMINALS
    Guo, Xi
    Huang, Shell Ying
    Hsu, Wen Jing
    Low, Malcolm Yoke Hean
    PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, : 2230 - 2241
  • [30] YARD CRANE DISPATCHING TO MINIMIZE VESSEL TURNAROUND TIMES IN CONTAINER TERMINALS
    Huang, Shell Ying
    Li, Ya
    Guo, Xi
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 1747 - 1758