Lower bounds for minimizing total completion time in a two-machine flow shop

被引:0
|
作者
Han Hoogeveen
Linda van Norden
Steef van de Velde
机构
[1] Utrecht University,Institute of Information and Computing Sciences
[2] Delft University of Technology,Faculty of Electrical Engineering, Mathematics and Computer Science, Department of Software Technology
[3] Erasmus University Rotterdam,Faculty of Business Administration/Rotterdam School of Management
来源
Journal of Scheduling | 2006年 / 9卷
关键词
Completion Time; Slack Variable; Linear Programming Relaxation; Total Completion Time; Partial Schedule;
D O I
暂无
中图分类号
学科分类号
摘要
For the \documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\mathcal{NP}$$\end{document}-hard problem of scheduling n jobs in a two-machine flow shop so as to minimize the total completion time, we present two equivalent lower bounds that are computable in polynomial time. We formulate the problem by the use of positional completion time variables, which results in two integer linear programming formulations with O(n2) variables and O(n) constraints. Solving the linear programming relaxation renders a very strong lower bound with an average relative gap of only 0.8% for instances with more than 30 jobs. We further show that relaxing the formulation in terms of positional completion times by applying Lagrangean relaxation yields the same bound, no matter which set of constraints we relax.
引用
收藏
页码:559 / 568
页数:9