Minimizing the total flow time and the tardiness in a two-machine flow shop

被引:11
|
作者
Lee, WC [1 ]
Wu, CC [1 ]
机构
[1] Feng Chia Univ, Dept Stat, Taichung 40724, Taiwan
关键词
D O I
10.1080/002077201300029746
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper is concerned wit the two-criteria problem in a two-machine flow shop. The objective was to find a job sequence that minimized both the total flow time and the tardiness. Several dominant properties for the precedence relationship between jobs are proposed and a lower bound on the flow time and tardiness value for a subproblem is derived. The computational results of a branch-and-bound algorithm are also reported.
引用
收藏
页码:365 / 373
页数:9
相关论文
共 50 条
  • [1] MIP models for minimizing total tardiness in a two-machine flow shop
    Kharbeche, M.
    Haouari, M.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (05) : 690 - 707
  • [2] Minimizing tardiness in a two-machine flow-shop
    Pan, JCH
    Chen, JS
    Chao, CM
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2002, 29 (07) : 869 - 885
  • [3] A note on valid inequalities for minimizing the total tardiness in a two-machine flow shop
    Spindler, Sebastian
    Soppert, Matthias
    Steinhardt, Claudius
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2023, 74 (12) : 2573 - 2577
  • [4] Lower bounds for minimizing total completion time in a two-machine flow shop
    Hoogeveen, Han
    van Norden, Linda
    van de Velde, Steef
    [J]. JOURNAL OF SCHEDULING, 2006, 9 (06) : 559 - 568
  • [5] Lower bounds for minimizing total completion time in a two-machine flow shop
    Han Hoogeveen
    Linda van Norden
    Steef van de Velde
    [J]. Journal of Scheduling, 2006, 9 : 559 - 568
  • [6] Minimizing total completion time in a two-machine flow shop with deteriorating jobs
    Wang, Ji-Bo
    Ng, C. T. Daniel
    Cheng, T. C. E.
    Liu, Li-Li
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2006, 180 (01) : 185 - 193
  • [7] Two-machine flow shop total tardiness scheduling problem with deteriorating jobs
    Bank, M.
    Ghomi, S. M. T. Fatemi
    Jolai, F.
    Behnamian, J.
    [J]. APPLIED MATHEMATICAL MODELLING, 2012, 36 (11) : 5418 - 5426
  • [8] Minimizing the total weighted completion time in a two-machine proportionate flow shop with different machine speeds
    Choi, BC
    Yoon, SH
    Chung, SJ
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (04) : 715 - 728
  • [9] The two-machine total completion time flow shop problem
    DellaCroce, F
    Narayan, V
    Tadei, R
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) : 227 - 237
  • [10] Minimizing functions of infeasibilities in a two-machine flow shop
    Lushchakova, IN
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 121 (02) : 380 - 393