共 23 条
- [1] Problems in the construction and operation of flow lines in Western Siberia conditions [J]. NEFTYANOE KHOZYAISTVO, 2004, (12): : 72 - 75
- [2] Experience in 110 - 500 kV overhead transmission line construction and renovation projects in the northern regions of Western Siberia [J]. Power Technol. Eng., 2012, 4 (317-320): : 317 - 320
- [3] DESIGN OF STEEL PILE FOUNDATIONS FOR TRANSMISSION TOWERS [J]. IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1970, PA89 (03): : 399 - &
- [4] The design and construction of drilled anchor foundations and their use for supporting transmission line and communication towers. [J]. GROUND ANCHORAGES AND ANCHORED STRUCTURES, 1997, : 184 - 193
- [6] A feasibility study on construction methods of high voltage transmission towers’ foundations [J]. Archives of Civil and Mechanical Engineering, 21
- [8] Avifauna of Northern Western Siberia as a medium for bird flu transmission [J]. Russian Journal of Ecology, 2009, 40 : 297 - 300