Mathematical modeling and a discrete artificial bee colony algorithm for the welding shop scheduling problem

被引:0
|
作者
Xinyu Li
Shengqiang Xiao
Cuiyu Wang
Jin Yi
机构
[1] Huazhong University of Science and Technology,The State Key Laboratory of Digital Manufacturing Equipment and Technology, School of Mechanical Science and Engineering
[2] National University of Singapore,Department of Industrial Systems Engineering and Management
来源
Memetic Computing | 2019年 / 11卷
关键词
Welding; Scheduling; Discrete artificial bee colony algorithm; Welding shop scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
The welding process which is one of the most important assembly processes is widespread in the modern manufacturing industry, including aerospace, automotive and engineering machinery. The welding shop scheduling greatly impacts the efficiency of whole production system. However, few studies on the welding shop scheduling problem (WSSP) were reported. In this paper, a mathematical model and an improved discrete artificial bee colony algorithm (DABC) are proposed for the WSSP. Firstly, it is defined where multi-machine can process one job at the same time in the WSSP. Secondly, the mathematical models of WSSP have been constructed. Thirdly, an effective DABC is proposed to solve the WSSP, considering job permutation and machine allocation simultaneously. To improve the performance of proposed DABC algorithm, the effective operators have been designed. Three instances with different scales are used to evaluate the effectiveness of proposed algorithm. The comparisons with other two algorithms including genetic algorithm and grey wolf optimizer are also provided. Experimental results show that the proposed model and algorithm achieve good performance. Finally, the proposed model and DABC algorithm are applied in a real-world girder welding shop from a crane company in China. The results show that proposed model and algorithm reduces 55.17% production time comparing with the traditional algorithm and the scheduled machine allocation provides more reasonable arrangements for workers and machine loads.
引用
收藏
页码:371 / 389
页数:18
相关论文
共 50 条
  • [21] An Improved Artificial Bee Colony Algorithm for Job Shop Problem
    Yao, Baozhen
    Yang, Chengyong
    Hu, Juanjuan
    Yin, Guodong
    Yu, Bo
    [J]. ADVANCED MECHANICAL ENGINEERING, PTS 1 AND 2, 2010, 26-28 : 657 - +
  • [22] An improved artificial bee colony algorithm for fuzzy flexible job-shop scheduling problem
    改进人工蜂群算法求解模糊柔性作业车间调度问题
    [J]. Gong, Wen-Yin (wygong@cug.edu.cn), 1600, South China University of Technology (37):
  • [24] A hybrid artificial bee colony algorithm for the fuzzy flexible job-shop scheduling problem
    Wang, Ling
    Zhou, Gang
    Xu, Ye
    Liu, Min
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (12) : 3593 - 3608
  • [25] A hybrid artificial bee colony algorithm for a flexible job shop scheduling problem with overlapping in operations
    Meng, Tao
    Pan, Quan-Ke
    Sang, Hong-Yan
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (16) : 5278 - 5292
  • [26] Artificial bee colony algorithm for solving a bi-objective job shop scheduling problem
    Zhang, Rui
    [J]. Advances in Information Sciences and Service Sciences, 2011, 3 (08): : 319 - 326
  • [27] Improved artificial bee colony algorithm for distributed and flexible job-shop scheduling problem
    Wu, Rui
    Guo, Shun-Sheng
    Li, Yi-Bing
    Wang, Lei
    Xu, Wen-Xiang
    [J]. Kongzhi yu Juece/Control and Decision, 2019, 34 (12): : 2527 - 2536
  • [28] A Discrete Artificial Bee Colony Algorithm for TSP Problem
    Li, Li
    Chong, Yurong
    Tan, Lijing
    Niu, Ben
    [J]. BIO-INSPIRED COMPUTING AND APPLICATIONS, 2012, 6840 : 566 - +
  • [29] A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities
    Li, Jun-Qing
    Pan, Quan-Ke
    Tasgetiren, M. Fatih
    [J]. APPLIED MATHEMATICAL MODELLING, 2014, 38 (03) : 1111 - 1132
  • [30] Multiobjective Discrete Artificial Bee Colony Algorithm for Multiobjective Permutation Flow Shop Scheduling Problem With Sequence Dependent Setup Times
    Li, Xiangtao
    Ma, Shijing
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2017, 64 (02) : 149 - 165