Shield Tunneling in Rock–Soil Interface Composite Formations

被引:16
|
作者
Tang Y. [1 ,2 ]
Xu J. [1 ,2 ]
机构
[1] Key Laboratory of Geotechnical and Underground Engineering of the Ministry of Education, Tongji University, Shanghai
[2] Department of Geotechnical Engineering, College of Civil Engineering, Tongji University, Shanghai
来源
Tang, Yiqun (tangyiqun2@tongji.edu.cn) | 1693年 / Springer International Publishing卷 / 34期
关键词
Excavation face stability; Ground settlement; Rock-soil interface composite formations; Tunneling shield;
D O I
10.1007/s10706-016-9994-9
中图分类号
学科分类号
摘要
With increased demand for the tunnel construction in rock–soil interface composite formations, the influence on surrounding environment especially the excavation face instability during construction and ground settlement in the long term has gained great attention. The researches about environmental disturbance by shield tunneling construction in single ground as the soil or rock conditions have been developed continuously. However, due to the complexity and uncertainty of the interaction between rock–soil interface composite formations and shield machines, works on these special conditions have not been carried out sufficiently. In this paper the theoretical, experimental and numerical researches on the excavation face stability and ground settlement are discussed while the in situ datum are used to support them. First, the typical projects in rock–soil interface composite formations are listed and the difficulties met are summarized. Second, the failure model of excavation face and support pressure from the tunneling shield in rock–soil interface composite formations are discussed. Then, a comprehensive survey of the factors of ground settlement during and after construction and some effective prediction models are made. Finally, the existing problems and directions for future research are introduced. © 2016, Springer International Publishing Switzerland.
引用
收藏
页码:1693 / 1705
页数:12
相关论文
共 50 条
  • [21] Shield Tunneling Parameter Matching Model and UI Interface
    Hou, Gongyu
    Xu, Zhedong
    Li, Le
    Quan, Xiaoge
    Yang, Yajie
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [22] Face Stability Analysis of Slurry Shield Tunnels in Rock-Soil Interface Mixed Ground
    Lu, Ping
    Yuan, Dajun
    Chen, Jian
    Jin, Dalong
    Wu, Jun
    Luo, Weiping
    KSCE JOURNAL OF CIVIL ENGINEERING, 2021, 25 (06) : 2250 - 2260
  • [23] Face Stability Analysis of Slurry Shield Tunnels in Rock-Soil Interface Mixed Ground
    Ping Lu
    Dajun Yuan
    Jian Chen
    Dalong Jin
    Jun Wu
    Weiping Luo
    KSCE Journal of Civil Engineering, 2021, 25 : 2250 - 2260
  • [24] Pipeline deformation caused by double curved shield tunnel in soil-rock composite stratum
    Jiao, Ning
    Wan, Xing
    Ding, Jianwen
    Zhang, Sai
    Liu, Jinyu
    GEOMECHANICS AND ENGINEERING, 2024, 36 (02) : 131 - 143
  • [25] Numerical Simulation of Site Deformation Induced by Shield Tunneling in Typical Upper-Soft-Lower-Hard Soil-Rock Composite Stratum Site of Changchun
    Li, Liyun
    Du, Xiuli
    Zhou, Jing
    KSCE JOURNAL OF CIVIL ENGINEERING, 2020, 24 (10) : 3156 - 3168
  • [26] Numerical Simulation of Site Deformation Induced by Shield Tunneling in Typical Upper-Soft-Lower-Hard Soil-Rock Composite Stratum Site of Changchun
    Liyun Li
    Xiuli Du
    Jing Zhou
    KSCE Journal of Civil Engineering, 2020, 24 : 3156 - 3168
  • [27] MEASURED SOIL RESPONSE TO EPB SHIELD TUNNELING - DISCUSSION
    HANSMIRE, WH
    JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1984, 110 (02): : 305 - 306
  • [28] Analysis of the effect of groundwater on soil arch in shield tunneling
    Jinhu Song
    Yanke Gao
    Shuai Liu
    Arabian Journal of Geosciences, 2018, 11
  • [29] Conditioning experiment on sand and cobble soil for shield tunneling
    Huang, Zhiquan
    Wang, Chuang
    Dong, Jinyu
    Zhou, Jianjun
    Yang, Jihong
    Li, Yanwei
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 87 : 187 - 194
  • [30] MEASURED SOIL RESPONSE TO EPB SHIELD TUNNELING - CLOSURE
    CLOUGH, GW
    SWEENEY, BP
    FINNO, RJ
    JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1984, 110 (02): : 306 - 307