Parallel processor scheduling for minimizing total weighted tardiness using ant colony optimization

被引:0
|
作者
N. R. Srinivasa Raghavan
M. Venkataramana
机构
[1] India Science Lab,GM R&D and Strategic Planning
[2] Indian Institute of Science,Decision Sciences Laboratory, Department of Management Studies
关键词
Scheduling; Parallel processors; Total weighted tardiness; Metaheuristics; Ant colony optimization;
D O I
暂无
中图分类号
学科分类号
摘要
In the modern business environment, meeting due dates and avoiding delay penalties are very important goals that can be accomplished by minimizing total weighted tardiness. We consider a scheduling problem in a system of parallel processors with the objective of minimizing total weighted tardiness. Our aim in the present work is to develop an efficient algorithm for solving the parallel processor problem as compared to the available heuristics in the literature and we propose the ant colony optimization approach for this problem. An extensive experimentation is conducted to evaluate the performance of the ACO approach on different problem sizes with the varied tardiness factors. Our experimentation shows that the proposed ant colony optimization algorithm is giving promising results compared to the best of the available heuristics.
引用
收藏
页码:986 / 996
页数:10
相关论文
共 50 条
  • [41] Parallel ant colony optimization for resource constrained job scheduling
    Thiruvady, Dhananjay
    Ernst, Andreas T.
    Singh, Gaurav
    ANNALS OF OPERATIONS RESEARCH, 2016, 242 (02) : 355 - 372
  • [42] Parallel ant colony optimization for resource constrained job scheduling
    Dhananjay Thiruvady
    Andreas T. Ernst
    Gaurav Singh
    Annals of Operations Research, 2016, 242 : 355 - 372
  • [43] Unrelated parallel machine scheduling with setup times and a total weighted tardiness objective
    Kim, DW
    Na, DG
    Chen, FF
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2003, 19 (1-2) : 173 - 181
  • [44] Efficient bi-objective ant colony approach to minimize total tardiness and system unavailability for a parallel machine scheduling problem
    Berrichi, Ali
    Yalaoui, Farouk
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (9-12): : 2295 - 2310
  • [45] Efficient bi-objective ant colony approach to minimize total tardiness and system unavailability for a parallel machine scheduling problem
    Ali Berrichi
    Farouk Yalaoui
    The International Journal of Advanced Manufacturing Technology, 2013, 68 : 2295 - 2310
  • [46] A hybrid particle swarm optimization for parallel machine total tardiness scheduling
    Niu, Qun
    Zhou, Taijin
    Wang, Ling
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (5-8): : 723 - 739
  • [47] A hybrid particle swarm optimization for parallel machine total tardiness scheduling
    Qun Niu
    Taijin Zhou
    Ling Wang
    The International Journal of Advanced Manufacturing Technology, 2010, 49 : 723 - 739
  • [48] A lexicographic optimization approach for a bi-objective parallel-machine scheduling problem minimizing total quality loss and total tardiness
    Chen, Lu
    Yang, Wenhui
    Qiu, Kejun
    Dauzere-Peres, Stephane
    COMPUTERS & OPERATIONS RESEARCH, 2023, 155
  • [49] Minimizing total weighted tardiness in a generalized job shop
    De Bontridder, KMJ
    JOURNAL OF SCHEDULING, 2005, 8 (06) : 479 - 496
  • [50] Lower Bounds on the Total Tardiness and Total Weighted Tardiness for Scheduling Flowshop with Blocking
    Toumi, Said
    Jarboui, Bassem
    Eddaly, Mansour
    Rebai, Abdelwaheb
    2013 INTERNATIONAL CONFERENCE ON ADVANCED LOGISTICS AND TRANSPORT (ICALT), 2013, : 296 - 301