共 50 条
- [41] Emergency Materials Integrated Scheduling Based on Improved Ant Colony Algorithm [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MANAGEMENT AND ENGINEERING (CME 2014), 2014, : 314 - 321
- [45] SCHEDULING JOB FAMILIES ON NON-IDENTICAL PARALLEL MACHINES WITH TIME CONSTRAINTS [J]. PROCEEDINGS OF THE 2011 WINTER SIMULATION CONFERENCE (WSC), 2011, : 1994 - 2005
- [46] Scheduling job families on non-identical parallel machines with time constraints [J]. Annals of Operations Research, 2014, 213 : 221 - 234
- [48] Proficient Energy Consumption Algorithm Using HMAC and ANT Colony-Based Algorithm [J]. PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INTERNET COMPUTING AND INFORMATION COMMUNICATIONS (ICICIC GLOBAL 2012), 2014, 216 : 129 - 140