Compact ILP formulations for a class of solutions to berth allocation and quay crane scheduling problems

被引:0
|
作者
T. R. Lalita
G. S. R. Murthy
机构
[1] Indian Statistical Institute,SQC and OR Unit
来源
OPSEARCH | 2022年 / 59卷
关键词
Transportation; OR in container terminals; Berth allocation; Quay crane scheduling; Mathematical programming; Scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we consider an integrated berth and quay crane allocation and scheduling problem. Existing ILP formulations involve large number of variables and constraints making commercial solvers unsuitable for obtaining optimal solutions. We introduce a class of solutions and present compact ILP formulations to obtain them using commercial solvers on a fast track. The size of the formulations (number of variables and constraints) is very small compared to the existing formulations to find optimal solutions. Further, unlike general optimal solutions, the new class of solutions are easy to implement and thus are desirable from pragmatic angle. The quality of new solutions, evaluated through a number of numerical experiments, appears to be good.
引用
收藏
页码:413 / 439
页数:26
相关论文
共 50 条
  • [31] Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
    Turkogullari, Yavuz B.
    Taskin, Z. Caner
    Aras, Necati
    Altinel, I. Kuban
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 254 (03) : 985 - 1001
  • [32] Reactive strategy for discrete berth allocation and quay crane assignment problems under uncertainty
    Xiang, Xi
    Liu, Changchun
    Miao, Lixin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 126 : 196 - 216
  • [33] Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: A robust exact decomposition
    Chargui, Kaoutar
    Zouadi, Tarik
    Sreedharan, V. Raja
    COMPUTERS & OPERATIONS RESEARCH, 2023, 156
  • [34] A genetic algorithm for robust berth allocation and quay crane assignment
    Rodriguez-Molins M.
    Ingolotti L.
    Barber F.
    Salido M.A.
    Sierra M.R.
    Puente J.
    Progress in Artificial Intelligence, 2014, 2 (4) : 177 - 192
  • [35] Integrated berth allocation and quay crane assignment with maintenance activities
    Zheng, Feifeng
    Li, Ying
    Chu, Feng
    Liu, Ming
    Xu, Yinfeng
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (11) : 3478 - 3503
  • [36] Integrated of Berth Schedule and Quay Crane Allocation in Container Terminal
    Qian Jifeng
    Zhu Xiaoning
    Liu Yongjun
    APPLIED SCIENCE, MATERIALS SCIENCE AND INFORMATION TECHNOLOGIES IN INDUSTRY, 2014, 513-517 : 1437 - 1444
  • [37] Integrated berth allocation and quay crane assignment and scheduling problem under the influence of various factors
    Yu, Meng
    Liu, Xuetao
    Ji, Xiaojing
    Ren, Yucong
    Guo, Wenjing
    IET COLLABORATIVE INTELLIGENT MANUFACTURING, 2024, 6 (04)
  • [38] The berth allocation and quay crane assignment problem with crane travel and setup times
    Correcher, Juan F.
    Perea, Federico
    Alvarez-Valdes, Ramon
    COMPUTERS & OPERATIONS RESEARCH, 2024, 162
  • [39] Simultaneous Berth and Quay Crane Allocation Problem in Container Terminal
    Lu, Zhiqiang
    Han, Xiaole
    Xi, Lifeng
    ADVANCED SCIENCE LETTERS, 2011, 4 (6-7) : 2113 - 2118
  • [40] Behavior perception-based disruption models for berth allocation and quay crane assignment problems
    Liu, Changchun
    Zheng, Li
    Zhang, Canrong
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 97 : 258 - 275