Multi-skill resource constrained project scheduling using a multi-objective discrete Jaya algorithm

被引:0
|
作者
Yang-Yuan Li
Jian Lin
Zhou-Jing Wang
机构
[1] Zhejiang University of Finance and Economics,School of Information Management and Artificial Intelligence
来源
Applied Intelligence | 2022年 / 52卷
关键词
Multi-objective; Jaya algorithm; Multi-skill; Project scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
Multi-skill resource constrained project scheduling problem (MS-RCPSP) is one of the widest investigated problems in manufacturing systems. This paper presents a multi-objective discrete Jaya (MODJaya) algorithm to address the MS-RCPSP with the objectives of minimizing makespan and total cost simultaneously. In MODJaya, the best and worst solutions are used to generate offspring. Two simple heuristics are employed to enhance the exploration ability. An efficient encoding and decoding pair is designed to construct feasible schedules, and different assignment criteria are proposed to increase solution diversity. In addition, a left-shift scheme is embedded into the decoding process for improving resource utilization. The performance of the proposed algorithm is evaluated on an intelligent multi-objective project scheduling environment benchmark dataset. Computational results and comparisons with the state-of-the-art algorithms indicate the superiority of the MODJaya in solving the multi-objective MS-RCPSP.
引用
收藏
页码:5718 / 5738
页数:20
相关论文
共 50 条
  • [1] Multi-skill resource constrained project scheduling using a multi-objective discrete Jaya algorithm
    Li, Yang-Yuan
    Lin, Jian
    Wang, Zhou-Jing
    [J]. APPLIED INTELLIGENCE, 2022, 52 (05) : 5718 - 5738
  • [2] Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Considering Flexible Resource Profiles
    Luo, Xu
    Guo, Shunsheng
    Du, Baigang
    Luo, Xinhao
    Guo, Jun
    [J]. APPLIED SCIENCES-BASEL, 2024, 14 (05):
  • [3] Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem Under Time Uncertainty
    Ghamginzadeh, Arman
    Najafi, Amir Abbas
    Khalilzadeh, Mohammad
    [J]. INTERNATIONAL JOURNAL OF FUZZY SYSTEMS, 2021, 23 (02) : 518 - 534
  • [4] Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem Under Time Uncertainty
    Arman Ghamginzadeh
    Amir Abbas Najafi
    Mohammad Khalilzadeh
    [J]. International Journal of Fuzzy Systems, 2021, 23 : 518 - 534
  • [5] A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem
    Maghsoudlou, Hamidreza
    Afshar-Nadjafi, Behrouz
    Niaki, Seyed Taghi Akhavan
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2016, 88 : 157 - 169
  • [6] Multi-Objective multi-skill resource-constrained project scheduling problem with skill switches: Model and evolutionary approaches
    Tian, Yuan
    Xiong, Tifan
    Liu, Zhenyuan
    Mei, Yi
    Wan, Li
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 167
  • [7] A multi-objective multi-agent optimization algorithm for the multi-skill resource-constrained project scheduling problem with transfer times
    Hosseinian, Amir Hossein
    Baradaran, Vahid
    [J]. RAIRO-OPERATIONS RESEARCH, 2021, 55 (04) : 2093 - 2128
  • [8] A knowledge-guided multi-objective fruit fly optimization algorithm for the multi-skill resource constrained project scheduling problem
    Wang, Ling
    Zheng, Xiao-long
    [J]. SWARM AND EVOLUTIONARY COMPUTATION, 2018, 38 : 54 - 63
  • [9] Improved selection in evolutionary multi-objective optimization of multi-skill resource-constrained project scheduling problem
    Laszczyk, Maciej
    Myszkowski, Pawel B.
    [J]. INFORMATION SCIENCES, 2019, 481 : 412 - 431
  • [10] A discrete oppositional multi-verse optimization algorithm for multi-skill resource constrained project scheduling problem
    Zhu, Lei
    Lin, Jian
    Wang, Zhou-Jing
    [J]. APPLIED SOFT COMPUTING, 2019, 85