Modeling of the Pit Corrosion Impact on the Stress State in a Mining Link Chain

被引:0
|
作者
Q. Zhang
Y. C. Cao
J. Y. Gu
Z. G. Wu
Y. Tian
F. Y. Lv
机构
[1] Liaoning Technical University,College of Mechanical Engineering
[2] Shandong University of Science and Technology,College of Mechanical and Electronic Engineering
来源
Strength of Materials | 2021年 / 53卷
关键词
mining plain link chain; ABAQUS; the depth of corrosion; the area of corrosion; the density of corrosion; steady stress; steady energy;
D O I
暂无
中图分类号
学科分类号
摘要
The chain link corrosion model was constructed by the finite element analysis software ABAQUS to evaluate the plain link chain impact under the changing behavior of different corrosion states. The link chain simulation study at different corrosion states was conducted (corrosion depth, area, and density), the curve of stress and energy variation with time was plotted. The stress distribution and related energy variations remained approximately the same at heavy loads. The steady stress of the corrosion chain link, friction dissipation energy, plastic dissipation energy, as well as steady internal energy, and corrosion depth, area, and density are fitted by third-degree polynomial relations. The maximum steady stress occurred at corrosion state III, which already exceeded the yield strength of the link chain below 20°C so that it made easy for the corrosion fracture to occur. This method provided important grounds for the design optimization and lifetime prediction of plain link chains.
引用
收藏
页码:682 / 689
页数:7
相关论文
共 50 条
  • [21] Mathematical modeling of stress-strain state in rock mass during mining with backfill
    V. M. Seryakov
    Journal of Mining Science, 2014, 50 : 847 - 854
  • [22] Mathematical modeling of stress-strain state in rock mass during mining with backfill
    Seryakov, V. M.
    JOURNAL OF MINING SCIENCE, 2014, 50 (05) : 847 - 854
  • [23] Analysis of stress-strain state of rock mass while mining chain pillars by chambers
    Buzylo, V.
    Yavorsk'yy, A.
    Yavorsk'yy, V.
    GEOMECHANICAL PROCESSES DURING UNDERGROUND MINING, 2012, : 95 - 98
  • [24] THE APPLICATION OF FUZZY MADM MODELING TO DEFINE OPTIMUM POST MINING LAND USE FOR PIT AREA TO RECOGNIZE RECLAMATION COSTS IN OPEN PIT MINING
    Bangian, Amir H.
    Ataei, Mohammad
    Sayadi, Ahmadreza
    Gholinejad, Alireza
    ARCHIVES OF MINING SCIENCES, 2011, 56 (01) : 93 - 118
  • [25] Corrosion pit-induced stress concentration in spherical pressure vessel
    Cerit, Muhammet
    THIN-WALLED STRUCTURES, 2019, 136 : 106 - 112
  • [26] A level set model for stress-dependent corrosion pit propagation
    Dekker, Richard
    van der Meer, Frans P.
    Maljaars, Johan
    Sluys, Lambertus J.
    INTERNATIONAL JOURNAL FOR NUMERICAL METHODS IN ENGINEERING, 2021, 122 (08) : 2057 - 2074
  • [27] Correlation between the geometric parameters of corrosion pit and stress concentration factor
    Zhao, Wei
    Huang, YongFang
    Ye, XuBin
    Hu, BenRun
    Liu, JianZhong
    Chen, LiJie
    ADVANCED RESEARCH ON MATERIALS, APPLIED MECHANICS AND DESIGN SCIENCE, 2013, 327 : 156 - 160
  • [28] Simultaneous Impact of a Two-Link Chain
    Marghitu, Dan B.
    Cojocaru, Dorian
    NONLINEAR DYNAMICS, 2014, 77 (1-2) : 17 - 29
  • [29] Simultaneous Impact of a Two-Link Chain
    Dan B. Marghitu
    Dorian Cojocaru
    Nonlinear Dynamics, 2014, 77 : 17 - 29
  • [30] Impact of Open Pit Mining in Gorlovka Coal Basin on Large Earthquakes
    Kishkina, S. B.
    Kocharyan, G. G.
    Budkov, A. M.
    Ivanchenko, G. N.
    Loktev, D. N.
    JOURNAL OF MINING SCIENCE, 2021, 57 (04) : 546 - 556