Modeling and optimizing a multi-period closed-loop supply chain for pricing, warranty period, and quality management

被引:0
|
作者
Fatemeh Keshavarz-Ghorbani
Alireza Arshadi Khamseh
机构
[1] Kharazmi University,Industrial Engineering Department, Faculty of Engineering
关键词
Acquisition cost; Pricing; Closed-loop supply chain; Multi-period; Warranty period; Metaheuristic algorithms;
D O I
暂无
中图分类号
学科分类号
摘要
Nowadays, most of the researchers have focused on collecting the used products to carry out the recovery process. This paper deals with the repair process to improve the virtual age of used products and integrate to forward flow as a closed-loop supply chain (CLSC). The products can be returned to the chain several times until they have the required quality to be repaired. Here the optimal number of returning and repairing the used products for maximization of the profits are calculated. Also, the price of selling the products, the acquisition cost, and the warranty period are determined to motivate the customers to bring back their used products and increase the demand for products. For our proposed multi-period problem, an appropriate inventory control policy is taken, and in case of increasing the production amount, additional capacity can be installed by extra cost. The proposed mixed-integer non-linear model has been solved by three metaheuristic algorithms: Particle Swarm Optimization Algorithm (PSO), Genetic Algorithm (GA), Invasive Weeds Optimization algorithm (IWO). Numerical problems depicted model efficiency and by the use of the Taguchi method, qualitative parameters of proposed algorithms are calibrated. Then, the performance comparison of the methods has been done by Relative Performance Deviation.
引用
收藏
页码:2061 / 2089
页数:28
相关论文
共 50 条
  • [31] Multi-period multi-scenario optimal design for closed-loop supply chain network of hazardous products with consideration of facility expansion
    Ma, Hongguang
    Li, Xiang
    Liu, Yankui
    [J]. SOFT COMPUTING, 2020, 24 (04) : 2769 - 2780
  • [32] Optimization of product refurbishment in closed-loop supply chain using multi-period model integrated with fuzzy controller under uncertainties
    Chen, Y. T.
    Chan, Felix T. S.
    Chung, S. H.
    Park, Woo-Yong
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2018, 50 : 1 - 12
  • [33] Novel model and kernel search heuristic for multi-period closed-loop food supply chain planning with returnable transport items
    Zhang, Yipei
    Chu, Feng
    Che, Ada
    Yu, Yugang
    Feng, Xin
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (23) : 7439 - 7456
  • [34] Warranty Matching in a Consumer Electronics Closed-Loop Supply Chain
    Calmon, Andre P.
    Graves, Stephen C.
    Lemmens, Stef
    [J]. M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2021, 23 (05) : 1314 - 1331
  • [35] Multi-objective programming for multi-period multi-product closed-loop supply chain network design: a fuzzy robust optimization approach
    Kim, JongChol
    Qiu, RuoZhen
    Jon, JinHyok
    Sun, Minghe
    [J]. ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2024,
  • [36] Warranty Period Decision and Coordination in Closed-Loop Supply Chains Considering Remanufacturing and Consumer Behavior
    Zhu, Xiaodong
    Yu, Lingfei
    Li, Wei
    [J]. SUSTAINABILITY, 2019, 11 (15)
  • [37] Dynamic supply chain network design with capacity planning and multi-period pricing
    Fattahi, Mohammad
    Mahootchi, Masoud
    Govindan, Kannan
    Husseini, Seyed Mohammad Moattar
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2015, 81 : 169 - 202
  • [38] Pricing decisions in a two-period closed-loop supply chain game under asymmetric information and uncertainty
    Beranek, Maria
    Buscher, Udo
    [J]. FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2023, 36 (04) : 1450 - 1502
  • [39] Production mode and pricing strategy of a two-period closed-loop supply chain considering fairness concerns
    Zhang, Cheng-Tang
    Ye, Yong
    Wang, Miao-Miao
    [J]. Zhang, Cheng-Tang (zct@ahau.edu.cn), 1600, International Association of Engineers (50): : 409 - 420