Copula-based Randomized Mechanisms for Truthful Scheduling on Two Unrelated Machines

被引:0
|
作者
Xujin Chen
Donglei Du
Luis F. Zuluaga
机构
[1] Chinese Academy of Sciences,Institute of Applied Mathematics, Academy of Mathematics and Systems Science
[2] University of New Brunswick,Faculty of Business Administration
[3] Lehigh University,Department of Industrial and Systems Engineering
来源
关键词
Algorithmic mechanism design; Random mechanism; Copula; Truthful scheduling;
D O I
暂无
中图分类号
学科分类号
摘要
We design a Copula-based generic randomized truthful mechanism for scheduling on two unrelated machines with approximation ratio within [1.5852,1.58606], offering an improved upper bound for the two-machine case. Moreover, we provide an upper bound 1.5067711 for the two-machine two-task case, which is almost tight in view of the known lower bound of 1.506 for the scale-free truthful mechanisms. Of independent interest is the explicit incorporation of the concept of Copula in the design and analysis of the proposed approximation algorithm. We hope that techniques like this one will also prove useful in solving other related problems in the future.
引用
下载
收藏
页码:753 / 781
页数:28
相关论文
共 50 条
  • [21] Preemptive and non-preemptive scheduling on two unrelated parallel machines
    Soper, Alan J.
    Strusevich, Vitaly A.
    JOURNAL OF SCHEDULING, 2022, 25 (06) : 659 - 674
  • [22] Preemptive and non-preemptive scheduling on two unrelated parallel machines
    Alan J. Soper
    Vitaly A. Strusevich
    Journal of Scheduling, 2022, 25 : 659 - 674
  • [23] A Copula-Based Markov Switching Seemingly Unrelated Regression Approach for Analysis the Demand and Supply on Sugar Market
    Pastpipatkul, Pathairat
    Panthamit, Nisit
    Yamaka, Woraphon
    Sriboochitta, Songsak
    INTEGRATED UNCERTAINTY IN KNOWLEDGE MODELLING AND DECISION MAKING, IUKM 2016, 2016, 9978 : 481 - 492
  • [24] Randomized on-line scheduling on two uniform machines
    Epstein, L
    Noga, J
    Seiden, S
    Sgall, J
    Woeginger, G
    JOURNAL OF SCHEDULING, 2001, 4 (02) : 71 - 92
  • [25] Two-stage ant colony algorithm based job shop scheduling with unrelated parallel machines
    Zhang, J. (zhangjie@sjtu.edu.cn), 1600, Chinese Mechanical Engineering Society (49):
  • [26] Asymptotic efficiency of the two-stage estimation method for copula-based models
    Joe, H
    JOURNAL OF MULTIVARIATE ANALYSIS, 2005, 94 (02) : 401 - 419
  • [27] A copula-based approach for estimating the survival functions of two alternating recurrent events
    Chatterjee, Moumita
    Sen Roy, Sugata
    JOURNAL OF STATISTICAL COMPUTATION AND SIMULATION, 2018, 88 (16) : 3098 - 3115
  • [28] Just-in-time scheduling with two competing agents on unrelated parallel machines
    Yin, Yunqiang
    Cheng, Shuenn-Ren
    Cheng, T. C. E.
    Wang, Du Juan
    Wu, Chin-Chia
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2016, 63 : 41 - 47
  • [29] Towards a Robust Scheduling on Unrelated Parallel Machines: A Scenarios Based Approach
    Naji, Widad
    Espinouse, Marie-Laure
    Van-Dat Cung
    MODELLING, COMPUTATION AND OPTIMIZATION IN INFORMATION SYSTEMS AND MANAGEMENT SCIENCES - MCO 2015 - PT II, 2015, 360 : 343 - 355
  • [30] Local search based methods for scheduling in the unrelated parallel machines environment
    Ulaga, Lucija
    Durasevic, Marko
    Jakobovic, Domagoj
    EXPERT SYSTEMS WITH APPLICATIONS, 2022, 199