Thermal power stations: Modernization of heat exchangers in steam turbine units taking features of their operation at specific thermal power plants into account

被引:0
|
作者
Ryabchikov A.Yu. [1 ]
Aronson K.É. [1 ]
Brodov Yu.M. [1 ]
Khaet S.I. [1 ]
Blinkov S.N. [1 ]
Zhelonkin N.V. [1 ]
机构
[1] Urals State Technical University (UGTU), UPI, Yekaterinburg
关键词
heat exchanger; modernization; piping system; steam turbine units;
D O I
10.1007/s10749-010-0166-4
中图分类号
学科分类号
摘要
The authors' experience in the modernization of commercial heat exchangers in steam turbine units is discussed with the individual features of the operation of these exchangers at specific thermal power plants taken into account. The variety of conditions under which heat exchanges operate in specific engineering subsystems requires an individualized approach to the model solutions that have been developed for modernizing these systems. New piping systems for commercial heat exchanges have undergone industrial testing and are in successful operation at a wide range of thermal power plants. © 2010 Springer Science+Business Media, Inc.
引用
收藏
页码:208 / 212
页数:4
相关论文
共 50 条
  • [41] Method for estimating and predicting the residual service life of condenser piping systems in steam-turbine units at thermal power plants
    Aronson K.É.
    Ryabchikov A.Yu.
    Brodov Yu.M.
    Murmanskii B.E.
    [J]. Power Technology and Engineering, 2010, 44 (2) : 146 - 152
  • [42] THERMAL DE-GASIFIERS IN STEAM DRIVEN POWER STATIONS
    LANGE, F
    [J]. BRENNSTOFF-WARME-KRAFT, 1971, 23 (05): : 195 - &
  • [43] TAKING INTO ACCOUNT THE BATTERY EFFECT IN DEVELOPMENT OF MECHANICAL ASH REMOVAL PLANT FOR THERMAL POWER-STATIONS
    KROPP, LI
    POTAPOV, OP
    [J]. THERMAL ENGINEERING, 1981, 28 (07) : 384 - 387
  • [44] Condensers of large steam turbines for thermal and nuclear power stations
    Nazarov V.V.
    Zaekin L.P.
    [J]. Thermal Engineering, 2007, 54 (10) : 828 - 835
  • [45] Reliability of steam pipelines of thermal power plants in the course of long-term operation
    O. I. Balyts’kyi
    I. V. Ripei
    Kh. A. Protsakh
    [J]. Materials Science, 2006, 42 : 461 - 465
  • [46] Reliability of steam pipelines of thermal power plants in the course of long-term operation
    Balyts'kyi, O. I.
    Ripei, I. V.
    Protsakh, Kh. A.
    [J]. MATERIALS SCIENCE, 2006, 42 (04) : 461 - 465
  • [48] Problems of Optimizing the Modes of CHP with a Complex Composition of Equipment, Taking into Account the Peculiarities of the CCGT and Steam Power Units Operation
    Arakelyan, E. K.
    Andryushin, A., V
    Mezin, S., V
    Pashchenko, F. F.
    Kosoy, A. A.
    Yagupova, Y. Y.
    [J]. IFAC PAPERSONLINE, 2021, 54 (13): : 268 - 273
  • [49] Adaptive control for the steam temperature of thermal power plants
    Matsumura, S
    Ogata, K
    Fujii, S
    Shioya, H
    [J]. PROCEEDINGS OF THE 1998 IEEE INTERNATIONAL CONFERENCE ON CONTROL APPLICATIONS, VOLS 1 AND 2, 1996, : 1105 - 1109
  • [50] Absorption thermal transformers for heat recycling at thermal power plants
    Elistratov, S. L.
    Mironova, N. V.
    [J]. THERMOPHYSICS AND AEROMECHANICS, 2023, 30 (02) : 381 - 386