Heuristic procedure for the economic lot-sizing problem with remanufacturing and recovery targets

被引:8
|
作者
Piñeyro P. [1 ]
Viera O. [1 ]
机构
[1] Department of Operations Research, Institute of Computer Science, Faculty of Engineering, Universidad de la República, Montevideo
关键词
Lot-Sizing problem with remanufacturing; Optimization; Recovery targets;
D O I
10.1007/s13243-018-0044-z
中图分类号
学科分类号
摘要
We address a production-remanufacturing planning problem of a single item with recovery targets stated as a lower bound on the numbers of returns that must be remanufactured. This problem can arise in practice if there are legal or market pressures. We show that this problem extension can be considered a generalization of the traditional problem without recovery targets, which is a well-known NP-hard problem even for the cost structure considered in this paper. A polynomial-time heuristic procedure is suggested, with different criteria for determining the periods with positive remanufacturing, which results in two different variants of the heuristic. To evaluate the heuristic, we extend a benchmark set of large instances of the literature in order to include different cost and recovery target settings. The results obtained from the numerical experiment allow us to conclude that the heuristic is cost- and time-effective for many scenarios of cost and recovery targets. However, the performance of the heuristic decreases as recovery targets increase. In addition, we note that our heuristic is able to achieve an optimal solution for many instances, even with a higher remanufacturing rate than the optimal solution obtained by a commercial solver. © 2018, Springer Science+Business Media B.V., part of Springer Nature.
引用
收藏
页码:39 / 50
页数:11
相关论文
共 50 条
  • [31] The economic lot-sizing problem with an emission capacity constraint
    Helmrich, Mathijn J. Retel
    Jans, Raf
    van den Heuvel, Wilco
    Wagelmans, Albert P. M.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 241 (01) : 50 - 62
  • [32] A MULTI-ITEM ECONOMIC LOT-SIZING PROBLEM
    PIERCE, JF
    IBM SYSTEMS JOURNAL, 1968, 7 (01) : 47 - &
  • [33] Valid inequalities for the capacitated lot-sizing problem in a hybrid manufacturing and remanufacturing system
    Ali, Sharifah Aishah Syed
    Ali, Fazilatulaili
    Talib, Muhamad Lazim
    Din, Wan Rozita Wan
    INTERNATIONAL JOURNAL OF MATHEMATICS AND COMPUTER SCIENCE, 2021, 16 (03): : 921 - 934
  • [34] A Computational Study of Lower Bounds for the Economic Lot-Sizing with Remanufacturing and Joint Setups
    Ali, Sharifah Aishah Syed
    Anuar, Mohd Syazwan Mohamad
    Majid, Khairani Abdul
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MATHEMATICAL SCIENCES AND TECHNOLOGY 2018 (MATHTECH 2018): INNOVATIVE TECHNOLOGIES FOR MATHEMATICS & MATHEMATICS FOR TECHNOLOGICAL INNOVATION, 2019, 2184
  • [35] Effective matheuristics for the multi-item capacitated lot-sizing problem with remanufacturing
    Cunha, Jesus O.
    Kramer, Hugo H.
    Melo, Rafael A.
    COMPUTERS & OPERATIONS RESEARCH, 2019, 104 : 149 - 158
  • [36] Economic lot-sizing games
    van den Heuvel, Wilco
    Borm, Peter
    Hamers, Herbert
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (02) : 1117 - 1130
  • [37] LAGRANGEAN RELAXATION FOR THE MULTIITEM CAPACITATED LOT-SIZING PROBLEM - A HEURISTIC IMPLEMENTATION
    THIZY, JM
    VANWASSENHOVE, LN
    IIE TRANSACTIONS, 1985, 17 (04) : 308 - 313
  • [38] MULTILEVEL LOT-SIZING PROBLEM - EVALUATION OF A SIMULATED-ANNEALING HEURISTIC
    KUIK, R
    SALOMON, M
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 45 (01) : 25 - 37
  • [39] Coordinated capacitated lot-sizing problem with dynamic demand: A Lagrangian heuristic
    Robinson, EP
    Lawrence, FB
    DECISION SCIENCES, 2004, 35 (01) : 25 - 53
  • [40] Solution algorithms for dynamic lot-sizing in remanufacturing systems
    Ahn, Hyung-Dae
    Lee, Dong-Ho
    Kim, Hwa-Joong
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (22) : 6729 - 6748